Everything looks too low versus final grade.

The underground conduits should have been re-dug and shifted. That would take less labor than this eye-sore.

If I were the GC I'd reject the work.

What's with the LB's? If the entire assembly were raised everything would start to make sense.

It's as if two different foremen schemed up this array.

The wasted materials and labor indicates foreman #2 flunked out of class.


Tesla