I can tell from the red fuse carriers that they are just solid links so there must be a intake somewhere else? Is that MICC supplying the cutout? If so, why the armoured cable? Is this in a plant room, one for each floor or something with the main intake on the ground floor so the armoured runs the final length to the individual consumer units?

I guess from the double live conducter that this is an Economy 7/10 setup with storage heaters.

Last edited by johno12345; 10/03/07 11:15 AM.

I took my time, I hurried up, The choice was mine, I didn't think enough