I can tell from the red fuse carriers that they are just solid links so there must be a intake somewhere else? Is that MICC supplying the cutout? If so, why the armoured cable? Is this in a plant room, one for each floor or something with the main intake on the ground floor so the armoured runs the final length to the individual consumer units?
I guess from the double live conducter that this is an Economy 7/10 setup with storage heaters.