Hi,
Thanks for the reply. I should have mentioned that I am not behind and never have been and she has never waited on me for anything..
I have been told a few times such and such was going to be done by x date and this was going to happen and that was going to happen but never did..
She was harrassing me when the plumbers were not even done and were not going to be out until a week or so.
I also noticed several pipes that were not tied in and she had to get the plumber back out to finish.
I was stalled several times because the builder could not get the roof on as predicted.
The job is 45 min drive.
I do not let my frustration show but I was wondering how much to give?
regards
Greg