> quote: We certainly cannot predict when a wiring fault may occur and energize everything in the building.
>Not possible. That's what grounding and bonding's about
That assumes the grounding is better than the visible wiring. If sections were replaced with plastic and not rebonded or if conduit sections pulled apart, plumbing or conduit could get energized... /mike