Electure:
Sorry... didn't mean to offend.
Actually, I have seen a number of temp services here in my area using FPE. They used to make a different dead-front which had space to install 4 or 5 breakers (in the upper part of the box). The lower part of the dead front was punched out for a pair of duplex receptacles, and one single (220v.?) receptacle as well. The receptacles were fastened directly to the dead front, connected to the breakers with short pieces of wire, and then the whole affair was kinda "squished" into place and secured.
I used to have a single pole FPE GFCI breaker in the panel in my house, before I replaced the entire thing with SqD a short time ago. It takes up the space of an NA frame (1") breaker, and has a handle the size of an NC type, along with a yellow "push to test" button. Not sure where the thing is now...probably threw it out with the panel when I upgraded.
Redsy: That's a good'un!
![[Linked Image]](https://www.electrical-contractor.net/ubb/biggrin.gif)
Those darn breakers cost too much anyway...
Mike (mamills)