Reno:
You said...."More importantly, the entire controversy ignores the latest twist to solar: micro inverters. With micro inverters, the generated power is converted to AC right at the solar panel, and is simply back-fed into your panel. No more "second meter," transfer switch, or permits needed."

Not the case here. Solar (resi) is about an even split between MIs and 'regular' inverters. Yes, permits are required. Yes, NET meters are still required.

As to solar dying a slow death....I get about five (5) per week (Resi).




John