ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 10
Recent Posts
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Dimmable LED 2x4 lay in fixtures
by gfretwell. 04/22/17 01:14 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
How do you find a good employee?
by HotLine1. 04/22/17 10:44 AM
Electrode boilers question
by SteveFehr. 04/21/17 08:32 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,488 Are you busy
169,150 Re: Forum
162,497 Need opinion
Who's Online Now
0 registered members (), 62 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#4356 - 09/19/01 05:43 PM Receptacle connections  
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Another quickie;

When connecting a duplex receptacle in the middle of a cable run, do you usually prefer:

1. Pigtail on the recept. & wirenut to join the three wires together in the box,

-or-

2. Incoming & outgoing wires one each onto the linked terminals on the recept?


Work Gear for Electricians and the Trades

#4357 - 09/19/01 06:47 PM Re: Receptacle connections  
Nick  Offline
Member
Joined: Aug 2001
Posts: 599
Riverside, CA
always pigtail myself.


#4358 - 09/19/01 08:10 PM Re: Receptacle connections  
Anonymous
Unregistered

What I do is largely governed by consideration of the neutral connection if multi-wire and then the amount of space in the box. Pigtailing old work is usually either impossible because of a lack of volume or the only option since the conductors are too short. Now that I am usually backwiring, pigtailing would be a waste of time and materials.


#4359 - 09/19/01 08:37 PM Re: Receptacle connections  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,306
the device will not feel the circuits ampacity when pigtailed, so i do so when possible.


#4360 - 09/19/01 09:53 PM Re: Receptacle connections  
sparky66wv  Offline
Member
Joined: Nov 2000
Posts: 2,236
West Virginia
Yep, same here, pigtail when I can, but there's those times you can't...


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

#4361 - 09/19/01 10:14 PM Re: Receptacle connections  
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Just wondered.

British twin (duplex) sockets only have one set of terminals, but they will accept 2 or 3 wires of the sizes normally used. I usually twist the wires together before inserting them.


#4362 - 09/19/01 10:47 PM Re: Receptacle connections  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
We always pigtail.
I once had an inspector tell me I was in violation of the Code!! [Linked Image] He actually took a connection apart in order to "teach me the right way."
The same inspector would not accept 30ft lbs of torque for 360 inch lbs (a real wizard).
I opened up a hot 4000A 480/277 service for him to inspect and demanded he put down his trusty aluminum Maglite. He looked at the busbars, then the light, and then rather sheepishly at me. He asked me to close the service back up, and never again gave me any trouble.


#4363 - 09/20/01 10:51 AM Re: Receptacle connections  
nesparky  Offline
Member
Joined: Jun 2001
Posts: 642
omaha,ne
We always pigtail. In the cities of Omaha and Lincoln it is required by local code.
It also allows you to replace a bad outlet without dirupting the rest of the circuit when necessary.


ed

#4364 - 09/20/01 06:20 PM Re: Receptacle connections  
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Quote
Originally posted by nesparky:
We always pigtail. In the cities of Omaha and Lincoln it is required by local code.
It also allows you to replace a bad outlet without dirupting the rest of the circuit when necessary.


Do you have to replace a receptacle hot very often? I assume this would be in something like an office where they don't want any other power shut off during working hours.


#4365 - 09/20/01 09:24 PM Re: Receptacle connections  
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,707
Anaheim, CA. USA
Put me into the Pigtail Only club also! It's just my preference, along with being a much "cleaner" method of splicing [IMHO].

Pauluk,
I hate to work a Receptacle change hot! Have done it before when the circuit could not be opened [as you mentioned], and will probably need to do it again - it's just sooooo much easier, safer and quicker to not work a live circuit.

P.S. Glad to have you on the board!


Scott SET


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!

Page 1 of 2 1 2

Member Spotlight
Posts: 165
Joined: March 2007
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.021s Queries: 15 (0.002s) Memory: 0.8143 MB (Peak: 0.9911 MB) Zlib enabled. Server Time: 2017-04-23 17:37:51 UTC