ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
1 registered members (sparky), 10 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
rewire #32736
01/01/04 05:34 PM
01/01/04 05:34 PM
F
frank  Offline OP
Member
Joined: May 2001
Posts: 376
windsor ontario canada
I have a wartime house that i will be rewiring and was wondering how you guys would go about pricing the job.Its your basic lath and plaster construction the service is new and the basement already wired.The first and second floor is knob & tube.I work mostly Industrial but have done a few of these jobs, however it was for family and I worked for free.Should I charge T&M or by the drop?And how much per drop if I do it that way.Happy New Year

Work Gear for Electricians and the Trades
Re: rewire #32737
01/01/04 06:13 PM
01/01/04 06:13 PM
G
ga.sparky56  Offline
Member
Joined: Nov 2002
Posts: 558
young harris georgia usa
T&M's the only way we do a job like that.

If they insist on a price,mine usually scares 'em. [Linked Image]

Re: rewire #32738
01/01/04 06:16 PM
01/01/04 06:16 PM
E
Electricmanscott  Offline
Member
Joined: Jan 2002
Posts: 1,457
Holden, MA USA
T&M, No doubt!

Re: rewire #32739
01/03/04 07:35 PM
01/03/04 07:35 PM
Attic Rat  Offline
Member
Joined: Dec 2003
Posts: 524
Bergen Co.,N.J. USA
..If they flinch at T&M,you gotta make a good list of everything you'll be covering...receptacles,switches,luminaires,dedicated circuits,..etc...and total up ALL of the material you'll have to get..Leave room for error...then take each task,one by one, and estimate,as best you could, how long that particular task is gonna take you...whether it's snaking in a wire,hanging a box,installing a fixture,..(which by the way,I have the H.O. pick out and supply...sometimes it's easier that way..)Set an hourly rate for yourself,and consider that if you have help,and have to pay that helper..it should be included in your rate..Then total every thing up and you've got a pretty good ballpark figure to bargain with..Figure in your permit cost as well..Most of all,express that this is the price for the items covered..and any deviations or "add-ons" are at an extra cost..this usually discourages the H.O. from changing his/her mind 9,000 times throughout the project...I think that covers it...GOOD LUCK..take your time in figuring this out,..you don't wanna get stuck doin; something for free!!!
AR


.."if it ain't fixed,don't break it...call a Licensed Electrician"
Re: rewire #32740
01/03/04 07:43 PM
01/03/04 07:43 PM
Attic Rat  Offline
Member
Joined: Dec 2003
Posts: 524
Bergen Co.,N.J. USA
...or you can price it "piece work"..and set a price for every task..ie;Receptacles @$35.00e,and single pole switches,@$35.00 per..3-ways I usually charge $45.00e,..Dimmers are usually not included in my bid unless expressly specified..but these are prices for open stud roughing,and closed wall snaking costs quite a bit more..it's more time consuming..ya gotta make that crystal clear to the H.O....
..ya also should take gutting the knob & tube into consideration..figure in the time you think it should take you,..then add an hour or two...hope this helps you..
AR


[This message has been edited by Attic Rat (edited 01-03-2004).]


.."if it ain't fixed,don't break it...call a Licensed Electrician"
Re: rewire #32741
01/04/04 10:35 AM
01/04/04 10:35 AM
D
DougW  Offline
Member
Joined: Jun 2003
Posts: 1,143
North Chicago, IL
I agree with the T&M method. I know of some estimating methods that include a 20-50% labor upcharge for old work/remodels.

(BTW, If you're lucky, and your AHJ allows NM, it fits pretty neatly through the holes left in the framing when you pop out the tubes. Saves drilling and lets you follow the same path back home)

Re: rewire #32742
01/04/04 12:42 PM
01/04/04 12:42 PM
F
frank  Offline OP
Member
Joined: May 2001
Posts: 376
windsor ontario canada
Thanks for the replies.Bx is mandatory here and what i usually do is install new rework boxes and drop jack chain down the walls then remove the old knob and tube and fill the old empty boxes moving room to room. If you guys have any more suggestions to make the job easier or tricks of the trade it would be greatly appreciated.Even though I'm a licensed guy you only know the work you that you do so with 13yrs in the trade I’m still a rookie at these types of jobs.thanks


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
waymag
waymag
dallas, texas, USA
Posts: 67
Joined: January 2002
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 16
Potseal 15
Popular Topics(Views)
243,576 Are you busy
180,374 Re: Forum
170,852 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.014s Queries: 14 (0.003s) Memory: 0.9838 MB (Peak: 1.1379 MB) Zlib enabled. Server Time: 2018-01-21 14:41:54 UTC