ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
Dimmable LED 2x4 lay in fixtures
by HotLine1. 04/24/17 05:43 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,849 Are you busy
169,628 Re: Forum
162,879 Need opinion
Who's Online Now
0 registered members (), 50 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#30843 - 10/29/03 11:22 AM Oil Change Facility  
mvrandazzo  Offline
Member
Joined: May 2002
Posts: 110
I receintly did some work in a Oil Change facility. I noticed in the pit that the wiring method was EMT and some rigid for physical protection. Is this supposed to be a classified locaiton?

Blessings, Mark


Work Gear for Electricians and the Trades

#30844 - 10/29/03 12:11 PM Re: Oil Change Facility  
resqcapt19  Offline
Member
Joined: Nov 2000
Posts: 2,148
IL
The pit is normally unclassified based on the use of ventilation. See 511.3(B)(3) which sends you to Table 514.3(B)(1).
don


Don(resqcapt19)


Member Spotlight
Vlado
Vlado
Croatia
Posts: 28
Joined: February 2011
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.011s Queries: 14 (0.003s) Memory: 0.7426 MB (Peak: 0.8590 MB) Zlib enabled. Server Time: 2017-04-28 04:15:11 UTC