ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 3
Recent Posts
FPE in Germany
by Texas_Ranger. 11/19/17 07:30 AM
Ceiling fan distance from outdoor hot tub
by gfretwell. 11/16/17 02:18 AM
diazed fuses
by Texas_Ranger. 11/13/17 03:02 PM
Theft deterrent alarm
by gfretwell. 11/12/17 01:39 PM
EEPROM errors on XC7Z010-2CLG225I chip
by twh. 11/07/17 05:45 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
242,589 Are you busy
178,761 Re: Forum
170,028 Need opinion
Who's Online Now
0 registered members (), 13 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#204952 - 01/24/12 11:59 AM 517.13 (A)Care Facility Grounding  
wewire2  Offline
Member
Joined: Nov 2002
Posts: 244
California
The commentary after 517.13(A)
reads "the second component in this approach is the separate insulated grounding conductor required by 517.13 (B. therefore, the metal raceway or metal cable or sheath must qualify as an equipment grounding conductor in accordance with 250.118, INDEPENDENT of any separate wire-type equipment grounding conductor."
Shouldn't it read "in addition to?" The way it reads seems to require the insulated conductor to be isolated back to the the panel and not bonded in the box as a parallel grounding method.


2017 / 2014 NEC & Related Books and Study Guides

#204956 - 01/24/12 09:22 PM Re: 517.13 (A)Care Facility Grounding [Re: wewire2]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,874
Brick, NJ USA
Point made & taken. Perhaps a 'bad' use of the word 'independent'.

Logic, is an insulated EGC and an approved metalic wiring method.



John

#204969 - 01/25/12 10:24 PM Re: 517.13 (A)Care Facility Grounding [Re: wewire2]  
wewire2  Offline
Member
Joined: Nov 2002
Posts: 244
California
Thanks for the affirmation John.


#204970 - 01/25/12 10:56 PM Re: 517.13 (A)Care Facility Grounding [Re: wewire2]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,874
Brick, NJ USA
It would be interesting to see if we get any other responses. Maybe George? Greg?


John

#204971 - 01/25/12 11:29 PM Re: 517.13 (A)Care Facility Grounding [Re: wewire2]  
Yoopersup  Offline
Member
Joined: Mar 2003
Posts: 834
Michigan
Doesn't 250.48 Cover that??Since its not referred to as an
isolated ground as in 250.146(D)
Yoopersup


#204972 - 01/25/12 11:30 PM Re: 517.13 (A)Care Facility Grounding [Re: wewire2]  
Yoopersup  Offline
Member
Joined: Mar 2003
Posts: 834
Michigan
Should be 250.148 Not 250.48 Opps


#204977 - 01/26/12 02:02 AM Re: 517.13 (A)Care Facility Grounding [Re: wewire2]  
wewire2  Offline
Member
Joined: Nov 2002
Posts: 244
California
Thanks Yoop
Yes,It's standard procedure to crimp the grounds together and land them in the box that contains a non I.G. device or a splice. In using the dictionary definition below, the wording in the NEC commentary is correct. Both systems can still be referred to as functionally independent even though they are connected. I now know that independent does not necessarily mean separate. Live and learn huh!!


Independent: Not dependent on anything else for function, validity, etc.; separate two independent units make up this sofa



Member Spotlight
MarkC10
MarkC10
CA, Inland Empire
Posts: 43
Joined: September 2013
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 15 (0.003s) Memory: 0.7841 MB (Peak: 0.9404 MB) Zlib enabled. Server Time: 2017-11-20 13:33:30 UTC