ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,347 Are you busy
174,811 Re: Forum
167,192 Need opinion
Who's Online Now
0 registered members (), 63 guests, and 4 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#152539 - 06/05/05 09:45 PM Wooden Mast  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,260
Fullerton, CA USA
Quote
Attached pic is the "before" pic for a service change I did. As you can see, there has already been one upgrade, with 1-1/2 RMC replacing the original wood service mast.
The old mast, complete with insulators, remains.


Renosteinke


[Linked Image]


Tools for Electricians:

#152540 - 06/06/05 12:14 AM Re: Wooden Mast  
NORCAL  Offline
Member
Joined: Sep 2002
Posts: 872
From the looks of the building,should have called for a disconnect, and let a demolition contractor take care of the rest.



Member Spotlight
Lostazhell
Lostazhell
Bakersfield, CA (Originally Orange Co.)
Posts: 1,431
Joined: February 2004
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 14 (0.004s) Memory: 0.7432 MB (Peak: 0.8581 MB) Zlib enabled. Server Time: 2017-07-26 12:48:08 UTC