ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
Dimmable LED 2x4 lay in fixtures
by HotLine1. 04/24/17 05:43 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
How do you find a good employee?
by HotLine1. 04/22/17 10:44 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,809 Are you busy
169,579 Re: Forum
162,839 Need opinion
Who's Online Now
0 registered members (), 91 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#137012 - 05/20/03 02:54 PM Brownouts  
C-H  Offline
Member
Joined: Sep 2002
Posts: 1,497
Stockholm, Sweden
Just to give you an idea of the situation facing utilities in developing countries I quote part of an article from Indiainfoline.

(One should keep in mind that India is an advanced country which has nuclear power, 800kV lines and all other advanced technologies.)

--------
Transmission And Distribution Losses (T&D) :Technical losses in T&D of 8-10% of the energy fed into the system are deemed to be normal. All India figures of T&D losses are alarmingly high - in excess of 22%. Lack of adequate investment in T&D systems and systematic distribution planning are major reasons contributing to technical factors for the high level of T&D losses. Defective metering, unmetered supply and pilferage are the main non-technical factors
[...]
Quality Of Power : The quality of power is also poor with the domestic sector voltage dropping to as low as 150 volts (as against 220 volts) and that in the EHV segment sometimes dropping to as low as 300kv (as against 400kv which is seldom available).
--------

The occasional flickering lights and rare blackout at home just doesn't seem like an issue...


Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement

#137013 - 05/21/03 03:52 AM Re: Brownouts  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
C-H,
800kV lines?!
Now I'd like to see that!.
If the power system in India is anything like thier passenger train system, I'm not surprised the losses are so high!. [Linked Image]


Let's face it, these days if you're not young, you're old - Red Green grin

#137014 - 05/21/03 06:07 PM Re: Brownouts  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
Offhand, in the northeastern US and north of the border there, 765/735kv is a major system. 500/525kV out west.


#137015 - 05/21/03 08:54 PM Re: Brownouts  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
Bjarney,
These are some pretty big voltages here.
How high are these lines above the ground?.


Let's face it, these days if you're not young, you're old - Red Green grin

#137016 - 05/21/03 10:05 PM Re: Brownouts  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
Aaack! You put me on the spot, Trumpy. If it’s not covered in sheet metal, and over three feet off the ground, I’m out of my league. [I am no sort of lineman.] CA-state codes generally call for 34 feet of ground clearance for 300-550kV. Don’t know what 765 requires—there’s none out in the Western System. 765 seems to end at around Chicago and western Kentucky, based on the 1997 national map.


#137017 - 05/22/03 08:29 AM Re: Brownouts  
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Quote
Defective metering, unmetered supply and pilferage are the main non-technical factors

I always remember seeing an article years ago about how the poor people of the "barrios" got free electricity.

There was a picture of a guy with his ladder up a pole adding his own unofficial "service drop." Just at this one pole there must have been at least two dozen bits of lamp cord twisted around the conductors and leading off in all directions to the shanties.

Wish I still had the photo to post....

I still recall the caption below: "This hazardous task has often resulted in electrocution."


[This message has been edited by pauluk (edited 05-22-2003).]


#137018 - 05/22/03 11:40 AM Re: Brownouts  
C-H  Offline
Member
Joined: Sep 2002
Posts: 1,497
Stockholm, Sweden
Trumpy, there are two 1150kV lines in Russia and Kazakstan. Currently, both are operated at only 500kV.

When the Indian powerlines are full, the rest of the electrons have to ride on top of the wires... [Linked Image]

[This message has been edited by C-H (edited 05-22-2003).]


#137019 - 05/24/03 08:20 AM Re: Brownouts  
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Only if there's no room for them to hang on the sides...... [Linked Image]


#137020 - 05/25/03 01:00 AM Re: Brownouts  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
Great comeback guys!.
1150kV, hmmm, too high for my liking!!. [Linked Image]


Let's face it, these days if you're not young, you're old - Red Green grin


Member Spotlight
cookcc
cookcc
California ,Long Beach
Posts: 28
Joined: May 2007
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.015s Queries: 14 (0.003s) Memory: 0.8026 MB (Peak: 0.9724 MB) Zlib enabled. Server Time: 2017-04-27 15:01:08 UTC