ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Photocell
by Docholiday. 01/22/18 10:52 AM
AreMetal Ladders Ever OK For Electrical Work?
by gfretwell. 01/22/18 01:15 AM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
1 registered members (brsele), 29 guests, and 14 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Hot Neutral #107737
08/02/04 09:53 PM
08/02/04 09:53 PM
Admin  Offline
OP
Administrator
Member
Joined: Oct 2000
Posts: 3,482
NY, USA
Quote
Found this service with the neutral and phase conductors reversed in the meter base while performing a final inspection on a single family dwelling.

- necbuff
[Linked Image]

[Linked Image]

2017 / 2014 NEC & Related Books and Study Guides
Re: Hot Neutral #107738
08/03/04 12:39 AM
08/03/04 12:39 AM
Lostazhell  Offline
Member
Joined: Feb 2004
Posts: 1,431
Bakersfield, CA (Originally Or...
Aside from the darwin award for not even being able to wire a meter socket, Please tell me thats not a bare AL ground wire going right in front of the main lugs for the panel?!?!?!? [Linked Image]

-Randy

[This message has been edited by Lostazhell (edited 08-03-2004).]

Re: Hot Neutral #107739
08/03/04 01:05 AM
08/03/04 01:05 AM
B
Big Jim  Offline
Member
Joined: Jul 2003
Posts: 394
Denver, CO USA
I think most 3 year-olds can match colors better than that. Things we do totally without concious thought are far beyond some people.

Re: Hot Neutral #107740
08/03/04 02:05 AM
08/03/04 02:05 AM
N
NORCAL  Offline
Member
Joined: Sep 2002
Posts: 876
Good panel, sloppy "work".

Re: Hot Neutral #107741
08/03/04 02:16 AM
08/03/04 02:16 AM
E
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
Is this service live?!!!!

No ground or bond between the meter and main, so the main case and neutral is 120, and one phase 0, the other 220?

Looks like some smoke damage there on the riser neutral?

This may not have happened if this person hadn't gone through all the "red tape" getting it inspected. Nice catch, and a real good thing you looked!


Mark Heller
"Well - I oughta....." -Jackie Gleason
Re: Hot Neutral #107742
08/03/04 12:41 PM
08/03/04 12:41 PM
E
electricman2  Offline
Member
Joined: Nov 2003
Posts: 269
Thomasville, NC USA
The GEC in pipe is nice although I dont understand the gap between end of pipe and meter can.


John
Re: Hot Neutral #107743
08/03/04 08:59 PM
08/03/04 08:59 PM
N
necbuff  Offline
Member
Joined: Jul 2004
Posts: 41
Lebanon Tn USA
Service not energized, I am AHJ and I obviously rejected this one. That is an insulated conductor in front of the lugs and the reason for the gap is for other utilites to have a spot to hit the GEC for their service, eg; catv, phone.


Kenny Wilee

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
CDS
CDS
Nicholson Ga
Posts: 34
Joined: June 2006
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
Potseal 15
sparky 15
Popular Topics(Views)
243,595 Are you busy
180,393 Re: Forum
170,862 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.018s Queries: 14 (0.003s) Memory: 0.9834 MB (Peak: 1.1378 MB) Zlib enabled. Server Time: 2018-01-22 19:48:58 UTC