ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
VFD MotorFeeders
by gfretwell. 10/19/17 01:02 AM
Generator Cable Sizing
by brsele. 10/18/17 07:39 PM
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
Another generator question
by HotLine1. 10/16/17 07:02 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,415 Are you busy
177,389 Re: Forum
168,987 Need opinion
Who's Online Now
1 registered members (brsele), 21 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#99279 - 08/04/06 02:39 PM "Equipment Grounding Conductor" to "Equipment bonding Conductor"  
tdhorne  Offline
Member
Joined: Mar 2001
Posts: 345
Maryland, USA
If a lot of us complain about their failure to adopt this common sense proposal is there any chance they will reconsider. Some of you know a lot more about the process then I'm willing to try and learn so what do you think of the chance of getting it adopted anyway.
--
Tom Horne

"This alternating current stuff is just a fad. It is much too dangerous for general use." Thomas Alva Edison


Tom Horne

"This alternating current stuff is just a fad. It is much too dangerous for general use" Thomas Alva Edison

2017 / 2014 NEC & Related Books and Study Guides

#99280 - 09/14/06 09:33 PM Re: "Equipment Grounding Conductor" to "Equipment bonding Conductor"  
tajoch  Offline
Member
Joined: Feb 2001
Posts: 54
Quinlan texas, usa
Speakin of Grounds n Grounding:
I was an electrician in the USN for 12 yrs, and then got out and went back to NEB, worked construction and then went industrial, and up there, (not sure if it was in the NEC or a local ordinance) on all new installs you weren't allowed to use the "Mechanical" (conduit/pipe etc)as your ground conductor. you had to run a copper ground wire. Now I live in Tx, and the people down here look at me like I'm nuts, I am currently working in a large manufacturing facility, and from the panels/controllers I have opened up there is not one green ground wire in the entire facility. We have just started automating some of the machines, but we are having problems, mostly IMO due to our out dated pwr distribution system.
whats the consensus on this?


#99281 - 09/15/06 12:19 AM Re: "Equipment Grounding Conductor" to "Equipment bonding Conductor"  
ShockMe77  Offline
Member
Joined: Jun 2005
Posts: 821
Rahway, New Jersey
I understand by code using EMT as the EGC is permissable, but is IMO a bad design issue. I always, and I mean always, use a seperate EGC. Its just too easy for the EMT to accidentially come apart at a coupling for instance and therefore the bond is no longer present to clear a fault if a fault occurs.


#99282 - 09/15/06 09:03 AM Re: "Equipment Grounding Conductor" to "Equipment bonding Conductor"  
ghost307  Offline
Member
Joined: May 2005
Posts: 916
Chicago Illinois USA
I've had several projects where a ground wire is required to be run.
That's a standard that is enforced at our local international airport (perhaps you've heard of it...O'Hare).
It's a requirement in Health Care occupancies.
I HATE relying on the conduit as the path. I've seen lousy couplings, busted connectors and gaps caused by expansion or evn just getting whacked by a passing forklift truck.
Unfortunately, I don't think there's much chance of a separate wire becoming a Code requirement soon...not with the price of Copper going nuts.


Ghost307

#99283 - 09/19/06 08:51 PM Re: "Equipment Grounding Conductor" to "Equipment bonding Conductor"  
tajoch  Offline
Member
Joined: Feb 2001
Posts: 54
Quinlan texas, usa
Thanx for the info, it must have been a local requirement. which works for me, I alwayz run a separate ground, It just makes sense to me.



Member Spotlight
akmaster
akmaster
alaska
Posts: 70
Joined: June 2012
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 14 (0.002s) Memory: 0.7699 MB (Peak: 0.9104 MB) Zlib enabled. Server Time: 2017-10-20 23:20:05 UTC