ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Prototype production service needed
by carmend12345. 09/24/18 04:40 AM
220/230/240V 60Hz Systems
by gfretwell. 09/23/18 02:50 PM
Inspection camera help
by petey_c. 09/22/18 07:52 AM
Motion detectors and dimmers
by gfretwell. 09/20/18 04:02 PM
Extension cords
by annemarie1. 09/20/18 08:54 AM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 3 guests, and 23 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
load calculation #98266
05/19/06 04:45 PM
05/19/06 04:45 PM
S
sparky66  Offline OP
Junior Member
Joined: Apr 2006
Posts: 2
NJ
I have my first multifamily dwelling renovation. I might need to confirm my calculations. This is the info.
38 units, 600 sq-ft each, 2 s a circuits;4 laundry circuits for the whole bldg; 1500w microwave and 1500w refrigerator each unit; heating would be 3-2000w(8 feet) 1-1000w(4' feet) electric heaters;(A/C load would be omitted)And would be supplied by 240/120 1 phase. Ok guys punch some number

2017 / 2014 NEC & Related Books and Study Guides
Re: load calculation #98267
05/19/06 06:17 PM
05/19/06 06:17 PM
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,708
Anaheim, CA. USA
What numbers did you come up with?

Did you include "House Circuits" in your calcs? (exterior lighting, specific loads, etc.)

Are the units using Non-Electric Cooking equipment?

Any Elevators? (possible ADA requirements),

You mention this is a "Renovation", what are the existing Service spec's and details?
Also, what is fed at each unit?

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
Re: load calculation #98268
05/19/06 07:13 PM
05/19/06 07:13 PM
S
sparky66  Offline OP
Junior Member
Joined: Apr 2006
Posts: 2
NJ
these is a 5 story building, no elevator, 1 stair 5 lights per floor common area so 25 lights 2-60watts fixtures, cooking is gas, there are 60 amps subpanels each apartm. There is an existing service 4 - 100 Amps each disconnect feeds 10 or 9 apartments.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
sbi
sbi
indiana
Posts: 47
Joined: March 2008
Show All Member Profiles 
Top Posters(30 Days)
Admin 13
Trumpy 11
Popular Topics(Views)
249,422 Are you busy
187,344 Re: Forum
176,686 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.016s Queries: 14 (0.003s) Memory: 0.9515 MB (Peak: 1.0766 MB) Zlib enabled. Server Time: 2018-09-24 09:36:11 UTC