ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Inspection camera help
by petey_c. 09/22/18 07:52 AM
Motion detectors and dimmers
by gfretwell. 09/20/18 04:02 PM
Extension cords
by annemarie1. 09/20/18 08:54 AM
220/230/240V 60Hz Systems
by gfretwell. 09/16/18 12:37 PM
Acronis Backup 2017
by gfretwell. 09/16/18 12:46 AM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
1 registered members (gfretwell), 22 guests, and 27 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Define "grouped" #97445
02/20/06 07:10 PM
02/20/06 07:10 PM
L
Larry Fine  Offline OP
Member
Joined: Feb 2005
Posts: 693
Richmond, VA
[Linked Image]


Larry Fine
Fine Electric Co.
fineelectricco.com
2017 / 2014 NEC & Related Books and Study Guides
Re: Define "grouped" #97446
02/20/06 10:39 PM
02/20/06 10:39 PM
G
George Little  Offline
Member
Joined: Jan 2004
Posts: 1,489
Michigan USA
Grouped-In the same area, collected together, congergated. [Linked Image] Example- There are 10 meters grouped together in one location. Am I missing something here?


George Little
Re: Define "grouped" #97447
02/21/06 01:23 AM
02/21/06 01:23 AM
G
gfretwell  Online Content

Member
Joined: Jul 2004
Posts: 9,289
Estero,Fl,usa
How far apart can "grouped" disconnects be?

This is just another of those service questions that end up "I know it if I see it", like how far can SE go inside the building.


Greg Fretwell
Re: Define "grouped" #97448
02/21/06 10:35 AM
02/21/06 10:35 AM
A
Alan Nadon  Offline
Member
Joined: Mar 2005
Posts: 399
Elkhart, IN. USA
The ten meters are grouped. They are not necessarily the service. If there are fire wall seperations. Each meter could be going to a service where the two to six service disconnects for that service are located.
This building if properly seperated inside it could have from ten to sixty "service disconnects" under one roof.
230.2 number of services and the definition of a building are important in determining if this compies with the Code.
Alan--
Looks like it might be 4 apt.s with a house panel in each group. With 20 minute walls between apt.s and a four hour between groups.
Just a guess.


Alan--
If it was easy, anyone could do it.
Re: Define "grouped" #97449
02/21/06 06:44 PM
02/21/06 06:44 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,024
Brick, NJ USA
Larry:
As eight conduits look to go 'down', are they in/under the slab??

Can't go further without more info.

As to 'grouped' I see 10 meters, possible 2 laterals, maybe only 1 'source' (BUD/Xfr.

John


John

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
sparky66wv
sparky66wv
West Virginia
Posts: 2,236
Joined: November 2000
Show All Member Profiles 
Top Posters(30 Days)
Admin 13
Trumpy 11
Popular Topics(Views)
249,382 Are you busy
187,312 Re: Forum
176,658 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.025s Queries: 14 (0.004s) Memory: 0.9681 MB (Peak: 1.1066 MB) Zlib enabled. Server Time: 2018-09-23 01:25:03 UTC