ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 587 guests, and 17 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Mar 2003
Posts: 48
G
GTE Offline
Member
Can parallel paths be an issue?

Work Gear for Electricians and the Trades

Workgear for Electricians

Joined: Jun 2003
Posts: 681
P
Member
If you take a close look at the illustration provided by Bob, you will see that only the GEC is run back to the Service panel. Notice how the rest of the 'connections' are bonded to the GEC, using the different electrodes as connection points.
This helps to reduce if not eliminate the parallel paths.

Those conductors that are bonded to the GEC are not Grounding Electrode Conductors, they are bonding conductors.

Pierre


Pierre Belarge
Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5