ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photos of the Week:

Avalon Theatre
Avalon Theatre-1 2 3 4

Random Gallery Image:
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 293 guests, and 32 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#85126 05/29/03 10:58 AM
Joined: Feb 2001
Posts: 89
E
Member
Hello

I have an equipment room with multiple power sources fed from seperate utility transformers. I have to bond a lot of gear in the room and my question is where should I get my ground? Building steel?

The room has many communications/server cabinets in it and I want them all bonded to ground. I know how I'm going to get to the ground once I find it but I want to make sure I select the proper path to earth.

Thanks in advance

Horizontal Ad
#85127 05/29/03 11:31 PM
Joined: Oct 2000
Posts: 3,669
Likes: 4
Administrator
Member
(moved to NEC Forum)

#85128 05/31/03 08:54 PM
Joined: Feb 2003
Posts: 138
W
Member
Quote
but I want to make sure I select the proper path to earth.

ALL of the equipement in the room is either cord and plug connected or hard wired, right?

Unless the electrician that connected the equipement or wired the room forgot to connect the ground wires, all of the equipement is already bonded.

The code requires all services to be connected to the same grounding electrodes, hence the separate systems has no relevance.

Hope this helps!
Dave

[This message has been edited by WebSparky (edited 05-31-2003).]


Dave

Link Copied to Clipboard
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5