ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 272 guests, and 11 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#80349 03/31/02 07:23 PM
Joined: Mar 2002
Posts: 11
S
Member
The city I work for is building a new water treatment plant on a 230 acre site with several well houses that are currently in various stages of construction. Some well houses were constructed over two years ago under previous contracts, but none of them are completely finished. I am an electronics tech for the city water department and will be working in this plant. Since I am a licensed master electrician, I have been doing all of the electrical change orders for this project. The electrical contractor installed the equipment in the well houses and I wired some of the motors. The motor wiring was not in the electricians contract and the city refuses to give the electrical contractor any extra work.
The well houses are small round structures and there is insufficient safe working space around all of the electrical equipment (See layout below). They were improperly designed and constructed that way. I discussed the safety issue with my supervisor and informed him that I would not work on any equipment while energized until they enlarged the buildings to meet code. His reply was that the buildings would not be rebuilt, that we would have to find a way to make it work, and that I was just trying to get out of doing the work. That pissed me off, [Linked Image] so I talked to my department head about the safety hazard. Again, I was told that the buildings would not be rebuilt and he needed time to research this. The city electrical inspector agrees with me but I think his hands are tied since this is a city project and one of the city's engineering staff is doing the onsite inspections.
While working in one of the well houses, I noticed one light fixture go off when the electric heater came on, so I wrote a work order to repair the problem. I will not work on it energized due to the insufficient safe working space, so my supervisor hired an electrical contractor to check the problem. I heard about this and informed him that this is an OHSA violation. I wrote a memo to my department head detailing the NEC (110-26) and OSHA (1910.303, 1926.403) violations. That got the wheels turning on resolving this issue.

Now tell me:

If NEC 110-26 only applies to energized equipment, how can you check voltage without safe working space? Or program the PLC in the control panel?
Should the buildings be rebuilt to comply with 110-26?
If the buildings are not rebuilt, should I contact OSHA? [Linked Image]

I look forward to your comments and remember, SAFETY FIRST.

[Linked Image from soli.inav.net]

[This message has been edited by sparks55 (edited 04-04-2002).]

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#80350 03/31/02 09:20 PM
Joined: Apr 2001
Posts: 507
G
Member
Sparks,

I'm a contractor.....if the city called me in to work on this I would do it.

If I was your boss, you'd have to be an extremely valuable and hard to replace employee for me to not be plotting your departure.

If I was a city taxpayer and had to pay to rebuild the pump houses....I'd be pissed.

It's not a perfect world....get over it.

GJ

#80351 03/31/02 10:05 PM
Joined: Feb 2002
Posts: 375
G
Member
We all decide what jobs we will work on and which we will not.

While the building may not meet the current code, it may meet the code at the time it was built.

In any case, the building may be exempt by statute from the code.

#80352 03/31/02 11:24 PM
Joined: Nov 2001
Posts: 273
C
Member
don't mean to rub no one the wrong way on this.so hear we go putting the costs of something first for the value of a human life.sparks55 has a good point safety should be first. maybe you guys might do it , but i'd be with sparks 55 on this & maybe it is exempt.that just shows you where a little money can get you.i'd rather loose my job than my life over something like this.heard & read quite a few cases of someone getting hurt or killed due to in sufficent space. hey guys i mean would you really work on omething like this?

#80353 04/01/02 06:01 PM
Joined: Mar 2002
Posts: 11
S
Member
golf junkie,

Thank you for your response.

I am a taxpayer in this city and I am not pleased with paying to rebuild the pump houses. I was a contractor before taking the city job and I always stressed safety to my employees. As an employee, I want to work safely. That is why we have OSHA. I question your motive to work in an unsafe situation. What is the purpose of NEC 110-26 and OHSA 1926.403(i)? Why are you willing to ignore safety to make a buck? I pray for you and your employees, if you have any. Safety is not an accident, it prevents them.

sparks55

#80354 04/01/02 08:00 PM
Joined: Mar 2001
Posts: 2,056
R
Member
Have you considered purchasing a rubber blanket in the event you are forced to troubleshoot some of this equipment.
In many industrial plants working space violations are a fact of life. If personal safety is your main concern, a rubber blanket would help.

#80355 04/01/02 11:28 PM
Joined: Nov 2000
Posts: 2,236
Likes: 1
Member
In the "real world", yes it is a fact of life that we can't always control the abuse of our working space requirements. However, I do share in your frustration. I constantly run into working space problems, some require some fancy contortions to get to!

It's also pretty hard to draw a line of what we will accept as a mere bending of the rules and what we will reject as breaking them.

Stand by what you believe in...


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
#80356 04/01/02 11:57 PM
Joined: Apr 2001
Posts: 507
G
Member
Sparks,

Sorry if I came off confrontational.

Bottom line is everyone has to make this call for themselves. Like you suggested, if you feel it's unsafe, kill the power before you touch it.

GJ

#80357 04/02/02 08:57 PM
Joined: Mar 2002
Posts: 11
S
Member
Thanks for your responses. This whole project was started over 3 years ago. None of the well houses are finished and the control panels aren't even wired yet. They still must comply with all building codes, even if constructed two years ago. Use of PPE does not exempt anyone from the NEC and OSHA requirement for safe working space, although rubber blankets may reduce the required space from 42" to 36" deep. I don't have a problem working on live equipment as long as there is enough space. Each of us can decide what risks we take, but the NEC and OSHA rules were written to reduce that risk. Would you work in a live 480V starter when the door opens less than 45 degrees?

Update on resolving the safety issue:

My supervisor said a meeting with the engineer is planned for this week with a directive from the city to make the well houses safe. This means whatever it takes. Here is a quote from the spec book:

"Installations must be entirely safe in every respect, and must not create any condition of any kind which will be harmful to any occupant of building, to operating personnel, to installation personnel, to testing personnel, to workmen, and to public; contractor for each installation shall be solely responsible for providing installations which will meet these conditions. If contractor believes that installation will not be safe for all parties, he shall so report in writing to the Engineer before any equipment is purchased or work is installed, giving his exact recommendations."

Kind of hard to argue with that!

sparks55

#80358 04/02/02 11:05 PM
Joined: Nov 2001
Posts: 273
C
Member
good job sparks 55!let us know how it goes. [Linked Image]