ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Welded Copper Connections
by gfretwell. 04/19/19 04:46 PM
Norwegian power?
by dsk. 04/19/19 10:29 AM
Israel
by annemarie1. 04/18/19 02:35 PM
Water heater calculationsSo when I count calculati
by watersparkfalls. 04/13/19 12:43 PM
Health Canada Electric Construction heaters recall
by dougwells. 04/12/19 01:22 AM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 7 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
the Plank house #79472
12/29/01 06:08 PM
12/29/01 06:08 PM
S
sparky  Offline OP
Member
Joined: Oct 2000
Posts: 5,372
Once again I am doing old work, this time on a 'plank' house. The exterior walls are made up upright planks, 3" thick , some up to 20" widebark included...

There is simply clapboard on the exterior, plaster/lath on the interior. I could just about sign my name with a sawzall by now,,,

The interior walls are mostly the same plank design, the exception being they are thinner, approx 1-1/2", maybe 2".

This allows for 1-1/2" dp 4 or 4 11/16 sq. with a mud plate. So comes the Q....how to maintain proper burial depth of wires???

Anyone else been there???
[Linked Image]

2017 / 2014 NEC & Related Books and Study Guides
Re: the Plank house #79473
12/30/01 02:09 PM
12/30/01 02:09 PM
E
Elzappr  Offline
Member
Joined: Dec 2001
Posts: 270
Oregon
Wow, that takes me back..I remodeled a plank house in '78, and it had even more wood. It had two layers of planking..don't know why! Maybe they ran two layers to compensate for warping? I kept expecting to find a hollow pocket..only to find that there was none!
But the wiring was easier because the receptacles were at the base of the baseboard. The switches were all located in voids behind molding at doorways. Sounds like you have a lot more work to do. I think the way to go is to route wire behind molding. I'll never forget the house we did 'cause it took two of us over two weeks to rewire that place..and I had been used to new wiring that takes only one or two days!

Re: the Plank house #79474
12/30/01 02:58 PM
12/30/01 02:58 PM
F
frodo  Offline
Member
Joined: May 2001
Posts: 129
louisville, ky usa
hi,
this is a case where wiremold looks wonderful!

i really feel sorry for you...i have been there and it is a terrible place to be, but not near as bad as trying to get paid for the additional labor and sometimes material to pull off the job...

i would just stay away from the unknown...its too hard to bid..now time and material is a different story..

good luck let us know what you do so that it may save me or someone else next time

regards

frodo

Re: the Plank house #79475
12/30/01 04:19 PM
12/30/01 04:19 PM
S
sparky  Offline OP
Member
Joined: Oct 2000
Posts: 5,372
Thanks Guys.
One look, and T&M it was.

Re: the Plank house #79476
12/30/01 04:48 PM
12/30/01 04:48 PM
E
ElectricAL  Offline
Member
Joined: Oct 2001
Posts: 597
Minneapolis, MN USA
Sparky,

You have a true gift for verbal imagery.
Quote
I could just about sign my name with a sawzall by now,,,

LOL

[Linked Image]


Al Hildenbrand

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
mersadrad
mersadrad
Montreal, Quebec, Canada
Posts: 28
Joined: March 2011
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
254,472 Are you busy
190,717 Re: Forum
180,431 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.024s Queries: 14 (0.005s) Memory: 0.9681 MB (Peak: 1.1021 MB) Zlib enabled. Server Time: 2019-04-20 10:24:59 UTC