ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
220/230/240V 60Hz Systems
by gfretwell. 09/23/18 02:50 PM
Inspection camera help
by petey_c. 09/22/18 07:52 AM
Motion detectors and dimmers
by gfretwell. 09/20/18 04:02 PM
Extension cords
by annemarie1. 09/20/18 08:54 AM
Acronis Backup 2017
by gfretwell. 09/16/18 12:46 AM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 38 guests, and 24 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Turnaround temporary wiring #7021
01/18/02 02:40 PM
01/18/02 02:40 PM
G
George Rueff  Offline OP
Member
Joined: Jan 2002
Posts: 12
Corpus Christi ,Texas
At my refinery we are about to start a turnaround.For those of you who don,t know what that is,it's best described as a 24 hour a day shut dowm of the plant to facilitate replacement of major parts by contractors.These things come real close to being a Woodstock style carnival from hell.
Question that arose dealt with our temporary wiring for the tents,tool trailer,etc.We are useing CLX type armoured cable.I proclain that this should be used with it's specified connectors on both ends,whereby effectively bonding the armour which is isolated from the grounding conductor otherwise.The fellows installing seem to think because there is an isolated grounding conductor there is no problem if the armour is not bonded.They are also using 2"rigid pipe to protect SO cord without bonding these conduits.Am I a worry wart or could this lead to a future accident?
w

Work Gear for Electricians and the Trades
Re: Turnaround temporary wiring #7022
01/18/02 04:39 PM
01/18/02 04:39 PM
E
Elzappr  Offline
Member
Joined: Dec 2001
Posts: 270
Oregon
You are absolutely RIGHT George!

Re: Turnaround temporary wiring #7023
01/18/02 07:24 PM
01/18/02 07:24 PM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,360
I 2nd Elzappr..

Re: Turnaround temporary wiring #7024
01/18/02 11:06 PM
01/18/02 11:06 PM
S
SPARKSALOT  Offline
Member
Joined: Dec 2001
Posts: 28
Omak, WA, USA
The metal armor is just like any other metalic raceway and must be bonded. Suggest they ask an OSHA inspector his opinion.......
Bet they won't. Also, I used to work for one of the BIG oil companies, and they were big on safety and regulation compliance. Get their safety people involved, I bet things change REAL quick.
Don

Re: Turnaround temporary wiring #7025
01/19/02 07:07 PM
01/19/02 07:07 PM
T
therain4  Offline
Member
Joined: Dec 2000
Posts: 38
Dunmore,Pa. U>S.A.
I would recommend they look at article 250-2(b) in the 1999 NECĀ® or 250.4 (2)&(3) in the 2002 NECĀ®.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,149
Joined: May 2003
Show All Member Profiles 
Top Posters(30 Days)
Admin 13
Trumpy 9
Popular Topics(Views)
249,439 Are you busy
187,355 Re: Forum
176,695 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.021s Queries: 14 (0.004s) Memory: 0.9667 MB (Peak: 1.1039 MB) Zlib enabled. Server Time: 2018-09-24 20:04:14 UTC