Print Thread
Rate Thread
Turnaround temporary wiring #7021 01/18/02 02:40 PM
Joined: Jan 2002
Posts: 12
G
George Rueff Offline OP
Member
At my refinery we are about to start a turnaround.For those of you who don,t know what that is,it's best described as a 24 hour a day shut dowm of the plant to facilitate replacement of major parts by contractors.These things come real close to being a Woodstock style carnival from hell.
Question that arose dealt with our temporary wiring for the tents,tool trailer,etc.We are useing CLX type armoured cable.I proclain that this should be used with it's specified connectors on both ends,whereby effectively bonding the armour which is isolated from the grounding conductor otherwise.The fellows installing seem to think because there is an isolated grounding conductor there is no problem if the armour is not bonded.They are also using 2"rigid pipe to protect SO cord without bonding these conduits.Am I a worry wart or could this lead to a future accident?
w

Work Gear for Electricians and the Trades
Re: Turnaround temporary wiring #7022 01/18/02 04:39 PM
Joined: Dec 2001
Posts: 270
E
Elzappr Offline
Member
You are absolutely RIGHT George!

Re: Turnaround temporary wiring #7023 01/18/02 07:24 PM
Joined: Oct 2000
Posts: 5,389
S
sparky Offline
Member
I 2nd Elzappr..

Re: Turnaround temporary wiring #7024 01/18/02 11:06 PM
Joined: Dec 2001
Posts: 28
S
SPARKSALOT Offline
Member
The metal armor is just like any other metalic raceway and must be bonded. Suggest they ask an OSHA inspector his opinion.......
Bet they won't. Also, I used to work for one of the BIG oil companies, and they were big on safety and regulation compliance. Get their safety people involved, I bet things change REAL quick.
Don

Re: Turnaround temporary wiring #7025 01/19/02 07:07 PM
Joined: Dec 2000
Posts: 38
T
therain4 Offline
Member
I would recommend they look at article 250-2(b) in the 1999 NECĀ® or 250.4 (2)&(3) in the 2002 NECĀ®.


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Bill Addiss
Bill Addiss
NY, USA
Posts: 3,961
Joined: October 2000
Show All Member Profiles 
Top Posters(30 Days)
BigB 3
Popular Topics(Views)
270,786 Are you busy
204,998 Re: Forum
193,113 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3