ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Inspections and Testing
by brsele. 04/23/18 04:45 PM
FEMA height and electrical equiment.,
by HotLine1. 04/20/18 08:49 AM
This anti-theist is priceless!!!
by LongRunner. 04/19/18 04:02 PM
Recall notice: Square D Services Switches
by gfretwell. 04/18/18 01:24 PM
Big Square D service switch Recall
by sparkyinak. 04/18/18 12:30 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 13 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
bid question #67219
06/29/06 08:36 PM
06/29/06 08:36 PM
M
mister h  Offline OP
Member
Joined: May 2006
Posts: 20
erie, pa. usa
Have a question for the EC residential contractors.
I haven' done a bid for new home for a couple of years and not getting back into it.

My question is with the price of wire what is the ball park for a square foot price.
We supplied everthing electrical except for lighting fixtures for around 2.40.

Just curious.

Thanks,
Ken


ken
Work Gear for Electricians and the Trades
Re: bid question #67220
06/29/06 09:31 PM
06/29/06 09:31 PM
E
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
All depends on location and general market. Around here doing point or Sq' is a bad idea, 90% of the work is custom homes, and by custom I mean UBER-CUSTOM. T&M @ $90-120 hr, or bid generated by gross estimate of same cost basis after pouring through every single detail and elevation. You need to charge for what you want to make, and perform, or loose it in back charges....

For instance, every outlet in the whole house I'm roughing now (Formerly owned by our Mayor) must be leveled to 1/8" tolorance 1/2" above baseboards, that will be leveled on the whole floor from a single point, with specific locations dialed out on the elevations. Zero tolorance on lighting! If an outlet or any of the 200+ recessed cans hits framing, they re-frame for it..... Layout alone is 3/4's of the actual work.

Even on speculative no-brainer D&B's the bids go out the same way, with fudge factors depending on the GC, Hassle and Tripe factors too for full adjustment of final price. Depending on the street, add parking in too.

Really its the only way to stay alive here, but I am in a rare market - The Soveriegn Island of San Fransico. (One of the most expensive markets in the country.) Drive across a bridge, different ball-game completely. Price by point and Sq'.....


Mark Heller
"Well - I oughta....." -Jackie Gleason

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
sbi
sbi
indiana
Posts: 47
Joined: March 2008
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
245,896 Are you busy
182,952 Re: Forum
172,767 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.015s Queries: 15 (0.004s) Memory: 0.9425 MB (Peak: 1.0613 MB) Zlib enabled. Server Time: 2018-04-23 22:37:46 UTC