ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
VFD MotorFeeders
by gfretwell. 10/19/17 01:02 AM
Generator Cable Sizing
by brsele. 10/18/17 07:39 PM
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
Another generator question
by HotLine1. 10/16/17 07:02 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,420 Are you busy
177,393 Re: Forum
168,993 Need opinion
Who's Online Now
1 registered members (gfretwell), 15 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#62602 - 02/20/06 08:01 PM Streetlight protection  
Rewired  Offline
Member
Joined: Jan 2006
Posts: 558
Hamilton, Ontario, Canada
I was just wondering, For those that have done any work with streetlighting, Is it common to omit fuses in each fixture or for the entire circuit?
Today we had one of our guys replace the photoeye on a fixture in the city and had its innards "vaporize" on him, not to mention it wiped out the photocell socket.. ( I can get pictures of the socket and possibly whats left of the eye if anyone wants to see it)....

Noticed its quite common for streetlights to be connected right up to the street buss with no fuses whatsoever... I was just wondering if thats common everywhere or is this PoCo being cheap and dangerous?

A.D


Work Gear for Electricians and the Trades

#62603 - 02/20/06 08:44 PM Re: Streetlight protection  
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
I've used these, installed in a "Quazite" box several feet from the pole.


http://www.bussmann.com/library/bifs/2126.PDF


#62604 - 02/20/06 10:39 PM Re: Streetlight protection  
RODALCO  Offline
Member
Joined: Dec 2005
Posts: 854
Titirangi, Akld, New Zealand
In New Zealand on the older streetlight circuits ( early to mid 1970's ) no individual fuses were provided for the individual streetlights to save on costs.

A 32 or 63 Amp back up fuse was controlling the S.L. section at a whole, with a S.L. fault either the fuse blew or the wires blew clear of the choke or autotransformer in the S.L. fitiing.

The common practise we adopt now, If for any fault location or maintenance a non-fused older S.L. pole is encountered a 6 or 10 Amp HRC fuse is fitted to provide some close protection for the lamp and not take out the whole S.L. supply.

The newer S.L.'s are now these days all fitted with an HRC or MCB for individual protection. ( 1980's onwards )

We use a pilot system here fed from the substations via a master lightcell.

please submit the photo to an ECN moderator for publishing.

regards

Raymond RODALCO


The product of rotation, excitation and flux produces electricty.

#62605 - 02/21/06 02:28 AM Re: Streetlight protection  
venture  Offline
Member
Joined: Jan 2006
Posts: 38
San Diego Ca USA
Lack of fuses caused a death at a bus stop here in San Diego a few years back. High Voltage street light circuit xformed to 110v for bus stop lighting. The high side, 4,800v, shorted to the case of the xformer energizing the ground wire to the bus stop bench. No fuse= electric chair. Rod


#62606 - 02/21/06 06:20 PM Re: Streetlight protection  
Rewired  Offline
Member
Joined: Jan 2006
Posts: 558
Hamilton, Ontario, Canada
Thank ypou for your responses!
Yes I wasn't sure what the norm was or should be... I have seen weatherproof fuseholders in most of the new "decorative" lights but none on the traditional wooden poles where everything is run overhead..
I do have "whats left" of the photo eye in my posession and the actual streetlight head is in the Garage.. as soon as I get Photos of it I will send them off so you all can see!
A.D



Member Spotlight
Theelectrikid
Theelectrikid
Levittown, PA
Posts: 810
Joined: April 2004
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 14 (0.003s) Memory: 0.7692 MB (Peak: 0.9053 MB) Zlib enabled. Server Time: 2017-10-21 08:46:35 UTC