ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photo of the Week:

Electric Cow Catcher?
Electric Cow Catcher?

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 76 guests, and 24 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#48078 02/03/05 10:49 AM
Joined: May 2003
Posts: 74
J
jkraft Offline OP
Member
My local road commision has purchased a 90KW generator with a 400A automatic transfer switch, suitable for use as service equipment, and wants me to connect it. The building is one of their maintenance garages and has a 2000A service with a 800A main. The supervisor wants me to down size the fuses to 400A saying that's all the service they need. I haven't done an actual load survey yet, but am concerned if the local inspector will even allow this. Any ideas?

Horizontal Ad
#48079 02/03/05 12:10 PM
Joined: Aug 2003
Posts: 1,374
R
Moderator
Do the load calc's and see what you come up with.


Ryan Jackson,
Salt Lake City
#48080 02/03/05 02:49 PM
Joined: Feb 2002
Posts: 182
B
Bob Offline
Member
Why not put a 400 amp fused panel at the generator or on the building and leave things as they are?
Also check with the utility and get the yearly max demand.
What is the voltage?



[This message has been edited by Bob (edited 02-03-2005).]


Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 

Member Spotlight
Posts: 362
Joined: April 2003
Top Posters(30 Days)
Popular Topics(Views)
333,350 Are you busy
258,687 Re: Forum
240,122 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5