ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Old Computers?
by gfretwell - 11/21/23 03:45 PM
Simplify MOSFET Test With Source Measure Meter
by gfretwell - 11/18/23 09:20 PM
Ontario Electrical Safety Report
by Admin - 11/02/23 08:56 PM
How are you Jersey folks about the windmills?
by HotLine1 - 11/01/23 07:47 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 21 guests, and 28 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Jan 2002
Posts: 324
A
Member
I often wonder why I spend so much time learning code and theory when the poco gets to call the shots and it's normally against everything i have been taught. I deal with four different pocos in this region but 90% of our work is supplied by two here locally.

One of the companies is a dream to work with. I say I need 15KVA 480/277 3ph xfmr bank, they say no problem. Meet the engineer, sight the line, it's a done deal.

The other poco tells me what they're going to bring and how far they will bring it (and 99% what they deliever is undersized).

I called today and said I needed to get an order written on a a job so they could move forward on getting the pole and xfmrs set up. I requested a 120/208Y for a 400A UG service. They then told me it would have to be a 120/240 open delta. I said "hey I have plans that show a Y system and I priced it as a Y system blah blah blah".

My request got denied. I guess it might be penny pinching by management. I don't know. I was just wondering if you guys have to play these games too?

Joined: Nov 2002
Posts: 267
W
Member
Is it because that's all that's readily available to the POCO? DELTA. I know a lot of factories I see here are all DELTA and we had installed 480x480 delta to WYE transformers in the buildings.


[This message has been edited by Wirenuttt (edited 01-05-2005).]

Joined: Dec 2004
Posts: 86
P
Member
I have almost never had to deal with this sort of thing so if I sound stupid it's because I am.

Does this amount to you having to get your own transformer to get the configuration you need?


Sam, San Francisco Bay Area
Joined: Jan 2002
Posts: 324
A
Member
Wirenutt, Three phase primaries run across the sight so no prob there. They said it did not "qualify" for a wye system. I think they are just trying to save a buck buy installing two xfmrs instead of three IMHO.

Joined: Nov 2004
Posts: 56
D
Member
around here if you say are a new construction or major remodel and say "hey i need this system or that system" both poco's will comply willingly. it seems the architects rule around here.


Scott

Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 
* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Attic Rat
Attic Rat
Bergen Co.,N.J. USA
Posts: 524
Joined: December 2003
Top Posters(30 Days)
Admin 1
Popular Topics(Views)
313,186 Are you busy
239,129 Re: Forum
222,897 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5