ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Unusual Well Pump Switch Failure
by sabrown - 10/28/20 04:31 PM
Look at this mess...
by InspectorE - 10/27/20 09:09 PM
New tool
by gfretwell - 10/24/20 11:09 AM
Where is Everyone?
by Bill Addiss - 10/17/20 07:04 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
1 registered members (Scott35), 18 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Automatic Generator #40935 08/09/04 09:25 PM
Joined: Mar 2004
Posts: 76
M
Megawatt Offline OP
Member
I am bidding on a Job, that involves the installation of a 7 KW, Natural Gas fueled generator.
This is the type sold at the Big Blue Box.
It seems like a fairly easy install, but I was wondering if anybody has had any experience with these, & how you went about pricing the job ?
I will be responsible for getting a Lic Plumber to hook up the Gas, and will test it, etc.
Thanks in advance !!!

Work Gear for Electricians and the Trades
Re: Automatic Generator #40936 08/10/04 12:53 AM
Joined: Jul 2003
Posts: 394
B
Big Jim Offline
Member
Check out the requirements for transferring the load from line to genset carefully. Those components are all special and usually pricey. You don't want to miss something there and have to eat it.

Re: Automatic Generator #40937 08/10/04 12:59 AM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
Check the gas pressure spec's, it may require additional regulator at the main line. (Require more pressure for the engine)

Where the city will allow you to put it...

Not cool on small lot neighborhoods, bugs the neighbors... It runs once a week for twenty minutes.

Maintenace, oil changes and the like.

Then the electric stuff. Then bid it.


Mark Heller
"Well - I oughta....." -Jackie Gleason
Re: Automatic Generator #40938 08/10/04 05:04 PM
Joined: Jun 2004
Posts: 220
T
trekkie76 Offline
Member
If it is a Generac/Guardian system, the typical pre- packaged system takes about 3-4 hrs to do. Make sure to put the generator 3 ft. from any combustible materials( like the house). also, should try to get as close as possible to the main panel. the genarator requires 11-14" water column pressure, NG or LPG. this usually requires a seperate regulator. If you postion the unit right, there is little in extra material to get. An annual maintenence agreement is a great way to make additional revenue from generator sales. Look at around 1-2 hrs(depending on liquid or air cooled) for annual maintainence.

Re: Automatic Generator #40939 08/11/04 02:48 AM
Joined: Mar 2004
Posts: 76
M
Megawatt Offline OP
Member
Thanks for the Info, I hadn't thought about yearly Maintenance !!!


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
CDS
CDS
Nicholson Ga
Posts: 34
Joined: June 2006
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
271,034 Are you busy
205,039 Re: Forum
193,154 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3