ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photo of the Week:

Multi Meter Service
Multi Meter Service

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 52 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#35102 03/05/04 08:22 AM
Joined: Oct 2001
Posts: 20
W
Member
Was reading a post that mentioned the use of a Story Stick, on new construction. Is there one design of a stick that works better. Does it actual hold the box in place, while you nail it in? Any detailed info would be appreciated. My ignorance comes from mostly doing service upgrades and "old" rewire jobs. (stuff nobody else wants to do)

Horizontal Ad
#35103 03/05/04 08:48 AM
Joined: Feb 2003
Posts: 169
R
Member
I didn,t read the post your talking about, but I usually make our own story poles. I just mark or cut 1/2 emt to the size I want. It beats streching your tape mesure out 8 or 9 feet and having it collapse.

#35104 03/05/04 09:14 AM
Joined: Aug 2003
Posts: 1,374
R
Moderator
I did the same thing as Russ.


Ryan Jackson,
Salt Lake City
#35105 03/05/04 09:33 AM
Joined: Jan 2004
Posts: 615
J
Member
The way we did it was this:

Nail up a recpt. and a switch opening at your desired height. For us it was 12" to center and 44" to center, but now or city is requiring 15" on the first floor per American Disabilties Act. We liked the 44" switch height because it worked well for counter top outlets and then we just kept the same height throughout to house.

Then take your measurment off the floor to the top of the bracket of each of the two boxes. cut 1/2 EMT to each length, stack them next to each other, and tape them together. Then we'd walk the whole house making marks similar to this "<". except the bottom of the mark was level and the top had the angle. this would differentiate the mark from a center mark, inticating top of the bracket. This way if for some reason you needed an opening measured to center, you'd just make a regular arrow and the guy coming behind you would know.

The reason we marked the top of the bracket was so we didn't have to croutch down to line up center of the box. Just make sure all your bracket boxes are the same brand.

But in answer to your question, no, it didn't hold the box. We still marked first and nailed up next. And just for reference, I come from the land of EMT and 1900 bracket boxes in residential.

#35106 03/05/04 10:47 AM
Joined: Nov 2002
Posts: 456
C
Member
I use a piece of panelling, masonite, plywood, a 1x2, or 2x4.

#35107 03/05/04 04:31 PM
Joined: Jun 2003
Posts: 1,143
D
Member
I use a piece of 1x3, with the locations marked on the board. One of my first journeymen taught me about marking a box placement (height) line on your hammer; another showed me his markered tape measure, but the tapes (and hammer handles) always seem to get way too marked up to readily discern the lines, and tapes bend at the wrong spot, or get snagged between studs, or many other problems [whine]...I like the dedicated stick idea better.

BTW I, too come from the land of "pipe and steel".

I've seen the ones with the boxes mounted to the board, but they seem really ungainly. The only time I used something like that was when the room design required me to mount the wall outlets in between the studs on a nailed up piece of 2x4 (talk about a PITA). I made a "mounted" stick up to position the supports at the correct height.

#35108 03/06/04 02:46 AM
Joined: Dec 2003
Posts: 524
Member
...Our receptacle box heights are 15" (or to the top of our hammers)to the TOP of the box,for normal receptacles,and 48" to the TOP of the box for switches..For kitchen counter and bathroom GFI's and switches, we go to 42" to the bottom of the box..that puts the box within the tile line and beneath the "bull-nose",that's usually at 48".I usually use my stick ruler, and a "sharpie",to mark out, and then let the "kids" bang on the boxes..
AR


.."if it ain't fixed,don't break it...call a Licensed Electrician"
Horizontal Ad
#35109 03/06/04 08:15 AM
Joined: Dec 2000
Posts: 4,294
Member
My favorite for resi was a piece of 1/2" plywood that I had notched in the sides to fit the box at the desired height.
That way I could set the box depth exactly.
For commercial/industrial fixtures (yeah, I know, luminaires) hanging at a set height AFF, we used to use story poles, but now just hang a rotating laser in a corner of the building and go...S

#35110 03/08/04 05:17 PM
Joined: Oct 2000
Posts: 4,145
Likes: 4
Member
Quote
but now just hang a rotating laser in a corner of the building and go...S
Pretty high-tech there Scott! [Linked Image]

[Linked Image]
Bill


Bill
#35111 03/08/04 10:32 PM
Joined: Apr 2002
Posts: 2,527
B
Moderator
electure — Does your laser singe nice accurate charcoal marks where it hits the studs?




[This message has been edited by Bjarney (edited 03-08-2004).]


Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 

Member Spotlight
Scott35
Scott35
Moreno Valley, CA. USA
Posts: 2,725
Joined: October 2000
Top Posters(30 Days)
Popular Topics(Views)
333,618 Are you busy
258,984 Re: Forum
240,407 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5