The company I work for has Greenlee super tuggers and Ultra tuggers along with motorized wire feeding equipment.
All of it is great stuff but big bucks, if you do not see a regular use of this equipment I would look into renting it on an as needed basis.
You can only do one task with this stuff so you better have a lot of pulling to do.
Also this stuff can damage and destroy the cans, enclosures, raceways and of course personal.
I will make the Norm Abram's statement.
"Be sure to read, understand and follow the safety directions that come with the equipment".
![[Linked Image]](https://www.electrical-contractor.net/ubb/smile.gif)
Get the right ropes, no stretchy stuff.
On the good side, this stuff works great with lube you will get the wires in.
I have installed four 600 kcmils in 3" EMT 350' through three 90s.
The puller was hitting 7000 lbs at times.
[This message has been edited by iwire (edited 11-23-2003).]