ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 228 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
#3060 09/18/01 08:17 AM
Joined: Aug 2001
Posts: 7,520
P
Member
This isn't something that I get asked, but then we have only 240/415V and not the variety of systems you use.

I do sometimes get asked to explain 3-phase, though. Except for isolated single properties, all domestic distribution is 3-ph 4-w wye with homes tapped off one phase, so in rural areas with overhead lines I sometimes get the question: "Why are there four wires up there?" Some folks who work in commercial buidings and see the 415V stickers ask how 415 relates to 240V.

I've found that many people can understand the concept of a "back-to-back" arrangement like your domestic 120/240, but start mentioning the sq. root of 3 and they're lost.

Tools for Electricians:

Tools for Electricians, Installers & Maintenance Technicians

#3061 09/18/01 08:17 PM
Joined: Aug 2001
Posts: 151
D
Member
In my area, the utility helps me with that question. They don't allow 3 phase to residences, they charge a premium for installing the extra xfmrs and the connection, and they charge a monthly premium for having it. That usually handles it. Two words- "costs more" does it.

#3062 09/19/01 06:53 AM
Joined: Aug 2001
Posts: 7,520
P
Member
I'm not sure what my local PoCo's response would be to a request for residential 3-phase. I don't THINK there's a specific policy against it, although I don't doubt the installation charge would be higher. With 1-ph 240V 100A now standard for new services, most folks have ample power for their needs.

About the only place normally to see 3-ph in a vaguely residential application is a large guest house. The IEE doesn't like the idea of the (eek!) "general public" getting close to 415V, so they specify that all recepts. in each room should be on the same phase.

Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5