ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Israel
by annemarie1. 04/18/19 02:35 PM
Welded Copper Connections
by gfretwell. 04/17/19 10:03 PM
Water heater calculationsSo when I count calculati
by watersparkfalls. 04/13/19 12:43 PM
Health Canada Electric Construction heaters recall
by dougwells. 04/12/19 01:22 AM
Burning out of return(white) side of 120volt rec
by richard. 04/08/19 07:12 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 2 guests, and 6 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Casino Wiring methods #218867
11/30/17 02:17 PM
11/30/17 02:17 PM
Y
Yoopersup  Offline OP
Member
Joined: Mar 2003
Posts: 849
Michigan
Casino I take it under Article 518 Place of Assembly ??

No PVC inside unless encased in 2 inches concrete .(518.4 A)

518.4 B Non rated Construction only Exceptions. (Info from Building Inspector)

PVC over Dropped ceiling tile ceilings? (15 min . fire rating )

2017 / 2014 NEC & Related Books and Study Guides
Re: Casino Wiring methods [Re: Yoopersup] #218880
12/09/17 11:44 AM
12/09/17 11:44 AM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,084
Brick, NJ USA
Yoopersup:

What you stated above is 'chapter and verse' out of the bible.

FWIW, I have not seen any jobs in places of assembly that used PVC or NM cable. The only PVC was within the floor slabs, and for the services.

The design professionals spec 'Conform to current NEC requirements' in the boilerplate verbiage, and usually you find in the general notes 'RMC, EMT, MC cabling only'


John

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Bill Addiss
Bill Addiss
NY, USA
Posts: 3,905
Joined: October 2000
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
254,445 Are you busy
190,685 Re: Forum
180,402 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.018s Queries: 15 (0.004s) Memory: 0.9433 MB (Peak: 1.0608 MB) Zlib enabled. Server Time: 2019-04-19 10:44:12 UTC