ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
New fan motor for Panasonic
by HotLine1. 06/25/19 03:53 PM
Burning out of return(white) side of 120volt rec
by crselectric. 06/14/19 02:15 AM
Video door bell causing chime activation of coil
by JoeTestingEngr. 06/13/19 12:43 PM
Troubleshooting Voltage Drop Across Relay
by gfretwell. 06/09/19 11:49 AM
Apple Recalls Three-Prong Wall Plug Adapters
by Admin. 06/05/19 09:06 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 4 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Botched concrete pour knocks out London subway... #212570
01/23/14 09:33 PM
01/23/14 09:33 PM
N
NJwirenut  Offline OP
Member
Joined: Sep 2001
Posts: 806
Bergen County, NJ
Service on London's Victoria Line was suspended when a room full of signaling gear was flooded with fast setting concrete from a nearby project. Would HATE to be the guy who has to clean this mess up...

http://www.telegraph.co.uk/news/ukn...s-London-Undergrounds-Victoria-Line.html

Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Re: Botched concrete pour knocks out London subway... [Re: NJwirenut] #212586
01/24/14 09:14 PM
01/24/14 09:14 PM
N
NORCAL  Offline
Member
Joined: Sep 2002
Posts: 882

Re: Botched concrete pour knocks out London subway... [Re: NJwirenut] #212589
01/24/14 09:45 PM
01/24/14 09:45 PM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,280
Fullerton, CA USA

It worked fine for me smile

Re: Botched concrete pour knocks out London subway... [Re: electure] #212613
01/27/14 01:42 AM
01/27/14 01:42 AM
Trumpy  Offline

Member
Joined: Jul 2002
Posts: 8,260
SI,New Zealand
I guess this is a wake up call to everyone that deals with cement in their day to day work.
Could be someone that failed to seal one of their ducts, could be someone that failed to glue a conduit.

Malleable cement has a large horizontal force as well as a vertical force, it will blow out any ducting or conduits that aren't held in place, therefore giving the "molten" cement somewhere to travel.

I was always trained to use a primer AND adhesive on any PVC conduit install, treat it like it is a pressurised water pipe they said.



Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
SafetyWired
SafetyWired
Pa, USA
Posts: 44
Joined: July 2013
Show All Member Profiles 
Top Posters(30 Days)
Admin 2
Popular Topics(Views)
255,892 Are you busy
191,869 Re: Forum
181,634 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.024s Queries: 15 (0.005s) Memory: 0.9607 MB (Peak: 1.0944 MB) Zlib enabled. Server Time: 2019-06-27 12:22:27 UTC