ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Single phase and what you call it.
by dsk. 11/12/18 11:10 AM
220/230/240V 60Hz Systems
by Albert. 11/07/18 12:48 AM
Black & Decker Recalls Hammer Drills
by Admin. 11/01/18 07:22 PM
Having around 30 projectors to dump
by gfretwell. 10/31/18 10:54 PM
Installing a small swimming pool
by TimothyHallam. 10/30/18 10:42 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 35 guests, and 20 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Bond abandoned piping? #210685
07/20/13 04:53 PM
07/20/13 04:53 PM
B
BigB  Offline OP
Member
Joined: Mar 2004
Posts: 734
Tucson, AZ USA
Is an abandoned metal piping system required to be bonded if it is left in place and intact?

Last edited by BigB; 07/20/13 04:53 PM.
2017 / 2014 NEC & Related Books and Study Guides
Re: Bond abandoned piping? [Re: BigB] #210690
07/21/13 06:52 AM
07/21/13 06:52 AM
S
shortcircuit  Offline
Member
Joined: Jun 2004
Posts: 610
massachusetts
If it is in or attached to the building and likely to become energized then I would say yes bond the piping system.

Re: Bond abandoned piping? [Re: BigB] #210692
07/21/13 01:59 PM
07/21/13 01:59 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,037
Brick, NJ USA
Another subjective item. Key phrase is 'likely to become energized'.

Perhaps the best answer is from your local AHJ.


John
Re: Bond abandoned piping? [Re: HotLine1] #210698
07/22/13 10:12 PM
07/22/13 10:12 PM
B
BigB  Offline OP
Member
Joined: Mar 2004
Posts: 734
Tucson, AZ USA
My interpretation of "likely to become energized" means if whatever the gas is hooked up to uses electricity then it is "likelt to become energized". Once the piping is abandoned, it is no longer connected to anything that could energize it.

It is a situation that we see when replacing services on older residences that have gone all electric to avoid the expense of re-piping leaking gas lines. Southwest construction methods often make plumbing replacement very hard and expensive (no attic, slab foundations)


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
sbi
sbi
indiana
Posts: 47
Joined: March 2008
Show All Member Profiles 
Top Posters(30 Days)
Admin 8
Popular Topics(Views)
251,383 Are you busy
188,621 Re: Forum
178,325 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.018s Queries: 15 (0.004s) Memory: 0.9594 MB (Peak: 1.0941 MB) Zlib enabled. Server Time: 2018-11-12 22:28:29 UTC