ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Questioning the electrical norms
by HotLine1 - 03/04/21 12:35 PM
Lock-down Thread
by gfretwell - 03/03/21 12:38 PM
Northern Tool Recalls Powerhorse Generators
by Admin - 02/25/21 09:49 PM
You will never guess
by gfretwell - 02/25/21 07:48 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 14 guests, and 18 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Code Requirement for #209604 04/11/13 08:48 PM
Joined: Oct 2004
Posts: 7
A
andrewh Offline OP
New Member
Evening All,
Can an Ontario/Canadian expert tell me any specific requirement for the condition of the service mast that I can use as reference?

A contractor working on a house next door was using a stone slinger to backfill and, what must have been a pretty big rock, hit the 2.5" mast holding our 200A service. The PVC is smashed exposing a 12" x 3" hole. The conductors look fine but I would like to make it crystal clear that this has to be fixed in accordance with code, asap.

Of course neither house is installing the service or even doing electrical at this point so there is no ESA inspection planned. The contractor knows it has happened but I don't want to delay in cases water gets in and then down into the meter below.
Any help or comments welcome.
Andrew

Tools for Electricians:
Re: Code Requirement for [Re: andrewh] #209605 04/11/13 09:12 PM
Joined: May 2003
Posts: 1,155
dougwells Offline
Member
Someone had to take out a permit for the existing Electrical work. Is this a temporary Service for Construction.?

Re: Code Requirement for [Re: andrewh] #209606 04/11/13 09:34 PM
Joined: Oct 2004
Posts: 7
A
andrewh Offline OP
New Member
No, it is an infill - demolished a single bungalow (power disconnected about a year ago) for a semidetached. They run the small tools of portable generator right now.

Since the damage to my property I doubt any of their permits would apply anyway.

Re: Code Requirement for [Re: andrewh] #209607 04/11/13 11:05 PM
Joined: May 2003
Posts: 1,155
dougwells Offline
Member
In BC the work would have to be done by a qualified Electrical Contractor. The power company will want a declaration that the conductors are safe from the Electrical Contractor. we would have to replace the PVC which means removing the conductors unless the can cut the PVC to replace a new section with out damaging the conductors.

Re: Code Requirement for waterproof supply mast [Re: andrewh] #209612 04/12/13 02:25 AM
Joined: Oct 2004
Posts: 7
A
andrewh Offline OP
New Member
Sorry for the truncated title.


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
pcsailor
pcsailor
Minneapolis, MN, USA
Posts: 21
Joined: September 2019
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
275,704 Are you busy
209,627 Re: Forum
196,966 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3