ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 392 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Oct 2000
Posts: 3,672
Likes: 4
Admin Offline OP
Administrator
Member
Quote
Two sets of photos, one is a newish design of installation known as MPBS - Mobile Phone Base Station and is designed to allow mobile phone masts to be installed on existing HV transmission towers taking its supply from MV supply via a transformer

The other two are just examples of MV transmission, but vertically aligned, due to the other set being removed.

John Orme

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

Software for Electricians

Software for Electricians, Installers & Maintenance Technicians

Joined: Dec 2002
Posts: 206
G
Member
I've noticed that sort of base station on HV pylons and two thoughts come to mind. 1 Does the HV transmission system have to be shut down for them to be worked on? and 2 Are there special measures incorporated to overcome EM interferance? The field strength must be enormous where they are located.

Joined: Jul 2004
Posts: 10,048
Likes: 38
G
Member
It looks like they locate the antenna low enough to get NESC clearance to the HV lines and I doubt a cell tower can even see 60hz.


Greg Fretwell
Joined: Feb 2002
Posts: 2,233
H
Member
I have seen cell tower horns on HV transmission tower, but I thought it was only there for support, not for power.

Joined: Sep 2005
Posts: 97
J
Member
They are designed to be worked on while everything is live, but the equipment on the ground has to be outside the circle of influence from earth faults on the tower.

the transformer on the 11kv pole can only supply the one single base station


There are a lot of fibre optic cables on HV transmission pylons here, its wrapped around the top earth conductor


I took my time, I hurried up, The choice was mine, I didn't think enough

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5