ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#207777 11/26/12 02:19 PM
Joined: May 2010
Posts: 30
B
Bravo Offline OP
Member
Hello,

Working on designing an electrical grounding system for a industrial building and was wondering if bonding metal hand rails to ground system is a requirement?

Thanks in advance

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Bravo #207780 11/26/12 03:08 PM
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
Not unless you determine that they are "likely to become energized". Then you bond them to the circuit EGC that will be likely to energize them. (like if there was ice melting equipment on the steps).


Greg Fretwell
gfretwell #207783 11/26/12 03:56 PM
Joined: May 2010
Posts: 30
B
Bravo Offline OP
Member
Thanks for the reply. These are interior stairs and do not anticipate them to be energized. The customer has requested them to be bonded.

Bravo #207787 11/26/12 08:49 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
In that case...the customer is right! Not required by NEC, but by customer spec.


John
Bravo #207795 11/27/12 11:24 AM
Joined: May 2005
Posts: 984
Likes: 1
G
Member
John, I like your attitude.

I get quite irate when I specifically call for something in the plans and specs only to have the Contractor tell me that "It's not required by the Code so I didn't include it. If you really want it you have to pay me extra".
Then we end up with the fight over what is included in the signed contract and it gets ugly really fast.

Not every job is 'design-build'...sometimes I want something just because I want (or need) it.


Ghost307
Bravo #207798 11/27/12 03:44 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Ghost:
Specs that are within or part of the plans, that exceed the required NEC standards must be installed. (Period)

Option is provide a signed and sealed letter from the Lic Design Professional to withdraw the spec item(s).

Thanks for the compliment


John
HotLine1 #207803 11/28/12 01:21 AM
Joined: Jul 2007
Posts: 1,335
S
Member
I know that frustration. Currently dealing with a a contractor to install two simple parts that were spelled out, part number, vendor's name, the works. After missing the deadline by six months, they installed the wrong parts...


"Live Awesome!" - Kevin Carosa
Bravo #207804 11/28/12 01:46 PM
Joined: Mar 2005
Posts: 212
G
Member
Really frustrating as a bidding contractor to get beaten for a project with a price that could ONLY be met by ignoring specs. Project gets built out of spec and someone, somewhere, signs off. Maddening.
I'm with HotLine and Ghost, build it the way its written. Code is a MINIMUM.

Bravo #207805 11/28/12 04:08 PM
Joined: Jan 2005
Posts: 5,445
Likes: 2
Cat Servant
Member
Maybe we need to take a lesson from our local GC's ... or, perhaps, from trades that don't worry about "code.'

I mean ... can you even imagine a customer giving a GC a plan for a 4-bedroom house,and the GC arguing that the zoning ordinance only required three bedrooms for the family? Can you imagine the GC refusing to build it - or building three bedrooms and then arguing with the customer?

Can you imagine a painter arguing with a customer over what color to use?

Now ... let's fast-forward to the end of the job. The GC has built three bedrooms (because that was 'enough' by code) and the painter has decided that 'teal' was a better choice than 'aquamarine.' Would you expect the customer to be happy with that?

All you can do is quote the plans, and note any objections or questions you might have.

renosteinke #207820 11/29/12 02:51 AM
Joined: Jul 2007