ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
VFD MotorFeeders
by gfretwell. 10/19/17 01:02 AM
Generator Cable Sizing
by brsele. 10/18/17 07:39 PM
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
Another generator question
by HotLine1. 10/16/17 07:02 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,432 Are you busy
177,407 Re: Forum
168,998 Need opinion
Who's Online Now
1 registered members (electure), 16 guests, and 6 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#205779 - 03/31/12 02:10 PM Event Hall/Apartment in same building  
Merlin  Offline
Member
Joined: Jan 2004
Posts: 170
NW Indiana
Hello to all.

I am bidding on a building remodel that will be an event hall on the lower level and an apartment on the 2nd floor. My question is what type of wiring method may I use on the 2nd floor apartment? I understand how article 518.4(A) applies to the event area on the main level. But, article 518.4(B) states that NM cable is permitted in "non-rated" construction. How do I make the determination as to this rating, without going to the AHJ?


Work Gear for Electricians and the Trades

#205780 - 03/31/12 04:21 PM Re: Event Hall/Apartment in same building [Re: Merlin]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,123
Estero,Fl,usa
I think the apartment is a dwelling area and needs to follow those rules. They are separate occupancies in my opinion.

But I am not the guy making the decision am I? smile

I would float your plan out there and see what comes from plan review.


Greg Fretwell

#205781 - 03/31/12 04:41 PM Re: Event Hall/Apartment in same building [Re: Merlin]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,872
Brick, NJ USA
Merlin:

"(B) Nonrated Construction. In addition to the wiring methods of 518.4(A), nonmetallic-sheathed cable, Type AC cable, electrical nonmetallic tubing, and rigid nonmetallic conduit shall be permitted to be installed in those buildings or portions thereof that are not required to be of fire-rated construction by the applicable building code.
FPN: Fire-rated construction is the fire-resistive classification used in building codes."

Fire rated construction ratings are determined from the Building Codes that are adopted in your state/area.

Are there any plans? The info you need should be on the cover page of the plans. You may be able to access the local building codes on your state/local websites.

IMHO, the apt floor/assembly ceiling component will be 'rated', probably 1 hr; possibly 2 hr., but this is only my guess.


John

#205782 - 03/31/12 05:45 PM Re: Event Hall/Apartment in same building [Re: Merlin]  
Merlin  Offline
Member
Joined: Jan 2004
Posts: 170
NW Indiana
Actually now that I re-read the plans, the information is given on the cover page. It states "1 hour fire barrier as required per table 508.3.3. However, A footnote states "We will be submitting an application for variance regarding the sprinkler system and seperation requirements due to the historical architecture of the existing building". So, I am not sure. Looks like I will be contacting the Engineer.


#205783 - 03/31/12 06:29 PM Re: Event Hall/Apartment in same building [Re: Merlin]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,872
Brick, NJ USA
Sounds like a plan!! I suggest you get any info from the engineer in writing to CYA


John

#205784 - 03/31/12 08:40 PM Re: Event Hall/Apartment in same building [Re: HotLine1]  
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Originally Posted by HotLine1
Sounds like a plan!! I suggest you get any info from the engineer in writing to CYA


Good advice, when it concerns an Event Hall, any changes that involve the fire codes need good documentation



#205787 - 04/01/12 12:35 AM Re: Event Hall/Apartment in same building [Re: Merlin]  
Tesla  Offline
Member
Joined: Jun 2004
Posts: 1,273
Sacramento, CA
ANY time you're involved in 'historical architecture' you're off the map....

You'll need to have your hand held by the AHJ and the plan-check crowd.

There will be serious issues WRT what is grandfathered or not.

My last project to be so involved became re-engineered on the fly almost to the final hour.

It's an altogether different experience.

Think of it as design/build/redesign/rebuild.... That's it!



Tesla


Member Spotlight
sparky66wv
sparky66wv
West Virginia
Posts: 2,236
Joined: November 2000
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.020s Queries: 15 (0.004s) Memory: 0.7875 MB (Peak: 0.9450 MB) Zlib enabled. Server Time: 2017-10-21 15:46:53 UTC