ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Where is Everyone?
by gfretwell - 11/30/20 04:12 PM
Happy Thanksgiving
by gfretwell - 11/30/20 04:04 PM
From an outsider- How does tipping work?
by gfretwell - 11/30/20 04:00 PM
Ground fault remover :-)
by dsk - 11/30/20 03:51 AM
What does your work place look like?
by Trumpy - 11/30/20 02:45 AM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
1 registered members (Scott35), 21 guests, and 16 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
700.27 Coordination #202028 07/11/11 10:37 AM
Joined: May 2010
Posts: 30
B
Bravo Offline OP
Member
Hello,

I have an existing emergency power dist. system with life safety & non-life safety loads. There is a requirement to add new life safety branch circuits. The existing emer. pwr system currently does not have overcurrent devices selectively coordinated.

Once we modify the existing system, is a coordination study required per NEC 700.27? The system was designed and constructed prior to 2005 NEC.

Thanks in advance.

2017 / 2014 NEC & Related Books and Study Guides
Re: 700.27 Coordination [Re: Bravo] #202029 07/11/11 02:20 PM
Joined: Apr 2002
Posts: 7,218
HotLine1 Offline
Member
dbravo:

I would discuss your situation with the AHJ in the town the project is in.

The extent of the mods you have to perform may be the deciding factor.



John

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
CharlieE
CharlieE
Indianapolis
Posts: 201
Joined: April 2004
Show All Member Profiles 
Top Posters(30 Days)
Trumpy 17
Popular Topics(Views)
272,125 Are you busy
206,018 Re: Forum
194,042 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3