ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 96 guests, and 10 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Jul 2004
Posts: 9,928
Likes: 34
G
Member
If you want to get into the 2014 cycle your time is running out. The proposals need to be in by November 4.

The form
http://www.nfpa.org/Assets/files/AboutTheCodes/70/NECProposalForm.doc


Tips

http://iaei.org/pdf/CodeProposalDevelopmentRev1.ppt

Thanks to Bryan Holland City of North Port for the heads up.


Greg Fretwell
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Jan 2005
Posts: 5,445
Likes: 3
Cat Servant
Member
Thanks for the heads up- though November is a fair bit off as yet.

Heck, I still haven't digested 2011.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5