ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Changing a Bulb
by gfretwell. 07/14/18 03:12 PM
Tray cable?
by gfretwell. 07/11/18 10:18 PM
Eaton Heavy Duty 30A and 60A Safety Switches
by Admin. 07/11/18 09:49 PM
ORTOVOX Recalls Avalanche Transceivers
by Admin. 07/11/18 09:44 PM
Tingle off the water spigot
by gfretwell. 07/08/18 12:58 PM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 11 guests, and 18 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
225.30 and generator circuits. #201383
05/30/11 04:48 AM
05/30/11 04:48 AM
G
gfretwell  Offline
OP
Member
Joined: Jul 2004
Posts: 9,242
Estero,Fl,usa
225.30(A) says you can have additional feeders or branch circuits for emergency and standby systems. Is that one per system?

If you have a generator transfer panel in building A, can you run multiple branch circuits to building B? (using up to 6 disconnects per 226.33).


Greg Fretwell
2017 / 2014 NEC & Related Books and Study Guides
Re: 225.30 and generator circuits. [Re: gfretwell] #201438
05/31/11 11:26 PM
05/31/11 11:26 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 6,985
Brick, NJ USA
Part 'a' of your inquiry...I venture yes, to one of each. In a real situation, it could be a tough sell re: 'standby' & 'emergency' details.

Part 'b' IMHO is 'yes', but I want to research more for confirmation!

This sounds like a 'George' question??


John
Re: 225.30 and generator circuits. [Re: gfretwell] #201452
06/01/11 08:56 PM
06/01/11 08:56 PM
G
George Little  Offline
Member
Joined: Jan 2004
Posts: 1,489
Michigan USA
Meaning????

#1 It's a good question?

#2 George should respond with an answer?

If you mean the latter, I would say that the generator could serve anything you want it to with a priority to the emergency circuits. I don't know what will trigger the generator to start - hopefully the failure of the emergency circuit(s) and if there is an overload on the generator, it must be designed such that it will shed the non-emergency loads. IMHO


George Little
Re: 225.30 and generator circuits. [Re: gfretwell] #201456
06/01/11 10:38 PM
06/01/11 10:38 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 6,985
Brick, NJ USA
George:

Meant......

#1, Yes, a good question, much like yours.

#2, Your answers are always welcome, and you are good as stirring the pot.

You make good points.



John
Re: 225.30 and generator circuits. [Re: gfretwell] #201461
06/02/11 12:40 AM
06/02/11 12:40 AM
G
gfretwell  Offline
OP
Member
Joined: Jul 2004
Posts: 9,242
Estero,Fl,usa
Load shedding was what prompted the question. If you had load management in building A controlling loads in building B, I can see why it might make things easier if you could run multiple circuits.

The more I think of it, you would probably be better off running low voltage signaling circuits to the second building and have local control but that doesn't address the original question.

Hurricane season started today so I am getting more generator questions from my friends here.


Greg Fretwell

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Samurai
Samurai
Fl.
Posts: 46
Joined: May 2007
Show All Member Profiles 
Top Posters(30 Days)
Admin 5
Popular Topics(Views)
248,142 Are you busy
185,601 Re: Forum
174,942 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.022s Queries: 15 (0.004s) Memory: 0.9696 MB (Peak: 1.1106 MB) Zlib enabled. Server Time: 2018-07-20 18:20:43 UTC