What do you think?
Should pig-tailing be mandatory in all situations? Or not? Why?
|
|
|
|
Joined: Jul 2004
Posts: 9,931 Likes: 34
Member
|
There is no compelling need. The receptacles are listed for feed through. I'm sure if you look at the various cycles of the ROP you can find more elegant defenses of the current code on this.
Greg Fretwell
|
|
|
|
Joined: Nov 2007
Posts: 764
Member
|
Nah. The way things are going, it’s probably just matter of time before we have push-in, quick connector blocks for all splices anyway.
|
|
|
|
Joined: Jul 2004
Posts: 9,931 Likes: 34
Member
|
The Ideal splice they are talking about is advertising this is perfect for "prefab" boxes. We may be buying boxes directly from China with the devices already installed. Snap them around the framing, push the wires in the splices, shove it all in the box and snap in a "button". Off you go. The only tool you need is the one you strip the wire with. Maybe they will come out with one that strips the jacket and both wires in one step on a 12/2 or 14/2 Romex Scary huh?
Greg Fretwell
|
|
|
|
Joined: Nov 2007
Posts: 764
Member
|
Yeah Greg, when those things become the norm, all those AFCI’s they made us install may actually come into their own. I think that is what they refer to as anticipating the need.
|
|
|
|
Joined: Apr 2002
Posts: 7,382 Likes: 7
Member
|
IMHO, the method installed (pigtail or feed-thru) is the installers option & choice.
Some of us prefer to pigtail at each location, some of us may be looking for that 'little labor & material cost reduction'. As there is no mandatory reason to pigtail in all situations (Yet), the choice is the installer.
Personally, I pigtail.
John
|
|
|
|
Joined: Oct 2000
Posts: 5,392
Member
|
I spent some quality time studying splices and connections as an apprentice.
In fact,i still do, especially if there's something new out there
bottom line, you get a quality connection/termination/circuit/install, if you spend quality time
that's something the nec just can't legislate
~S~
|
|
|
|
Joined: Jul 2002
Posts: 8,443 Likes: 3
Member
|
Could one of you guys please define the term "pig-tailing" for an out of towner?
|
|
|
|
Joined: Feb 2003
Posts: 939
Member
|
Sure I will be glad to describe what the pigtail means and I will be using the Euroepan terms what some area we will call takeoff spices or leads This is only a example what typical North Americiané verison look like but for other area it is pretty simauir to this. Not only we do that on small conductors but we do in large size conductor as well but useing diffrent methold to spice or pigtail larger one as well. Merci. Marc
Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)
|
|
|
|
Joined: Dec 2001
Posts: 2,498
Member
|
In Austria or Germany I never pigtail unless I encounter a seriously overfilled old-work box, for a very simple reason: box fill doesn't allow me to have any kind of connectors AND a device in a regular dephth 58mm box. If I have some old masterpice with more than 2 cables I don't have the coice, I have to pigtail because modern receptacles won't take more than 2 wires per terminal. I'd say that's a grey area then. In Germany it's worse since the standard box there only seems to be 40mm deep instead of the 50 we have in Austria. Deeper boxes exist, but are very rare, at least in Austria (haven't seen them in shops yet, except one very expensive electronics retailer with mostly German stock). Those 50mm deep boxes are barely enough to take a Schuko receptacles and 6 4" long 2.5mm2 conductors. Getting 9 1.5mm2 conductors + connectors + pigtails + receptacle in there is a major pain.
|
|
|