ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
dsk 13
Admin 8
Recent Posts
OD of Alum and Copper
by gfretwell. 08/22/17 07:04 PM
Grid problem??
by annemarie1. 08/21/17 01:10 PM
Bathroom electrical
by doc. 08/19/17 06:53 AM
electircal ageing test on IPC
by SIAME. 08/15/17 02:43 AM
electrical aging test on IPC
by gfretwell. 08/15/17 12:27 AM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,106 Are you busy
175,721 Re: Forum
167,931 Need opinion
Who's Online Now
0 registered members (), 80 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#193395 - 03/30/10 07:48 PM 3 phase 480v motor with 6 leads and no schematic  
LoneGunman  Offline
Member
Joined: Oct 2005
Posts: 141
Florida
I have to hook up a 50hp 480v motor, the schematic is gone. The 6 leads are what's throwing me. I can make out on the tag that the motor is dual voltage. It was previously fed with 480, when it was move instead of leaving the split bolts and cutting the feeders they cut the leads instead. The six leads are numbered 1,2,3,6,7,8 or it's 1,2,3,7,8,9. I can't tell if the 6 is a 6 or if it's a 9.

None of the 6 wires were connected to each other, even though they cut the leads to remove the motor they'd have no reason to undo connection in the peckerhead that were not attached to the feeders so I'm ASSuming 1 and 7 would go to L1, 2 and 8 to L2 and 3 and 9 to L3, I'd really hate to let the smoke out of this motor if I'm wrong.

Anyone have any ideas?


Work Gear for Electricians and the Trades

#193397 - 03/30/10 09:54 PM Re: 3 phase 480v motor with 6 leads and no schematic [Re: LoneGunman]  
wire twister  Offline
Member
Joined: Nov 2006
Posts: 23
Washington GA USA
If you have a copy of Uglys electrical reference it is in there, but sounds like you have it right if you want to run on 480.


#193400 - 03/30/10 11:39 PM Re: 3 phase 480v motor with 6 leads and no schematic [Re: wire twister]  
Tesla  Offline
Member
Joined: Jun 2004
Posts: 1,273
Sacramento, CA
From Electrical Pal, pg 6-4...

Wye wound motor for 240/480 3-phase volts...

It would appear that your motor was set for 240V and the T connections were:

1 to 7 and on to T1
2 to 8 and on to T2
3 to 9 and on to T3

4,5,6 are buried down in the peckerhead, all jumpered together.

Your '6' is a nine, for sure.

To connect at 480V you'll need to pull up the 4,5,6 leads and go with:

1 to T1
2 to T2
3 to T3
AND
4 to 7 jumpered
5 to 8 jumpered
6 to 9 jumpered

As always, if the rotation is wrong, swap T1 and T3.


Tesla

#193402 - 03/31/10 01:00 AM Re: 3 phase 480v motor with 6 leads and no schematic [Re: Tesla]  
LoneGunman  Offline
Member
Joined: Oct 2005
Posts: 141
Florida
Thanks guys. Tesla, how have you been? Haven't "talked" to you in ages.

Tesla, that's what I was thinking, my father in law who's a retired maintenance electrician said the same thing. The customer swears this motor was running at 480v, I went to where they said it was hooked up and 480v is the only thing there. So either they mixed the motors up somewhere or there is a way to wire that motor for 480v with the wires I have in the peckerhead. My FIL said in 30 something years he has never came across a motor where you could run it at 480v with the wires that are in the peckerhead.


#193404 - 03/31/10 01:44 AM Re: 3 phase 480v motor with 6 leads and no schematic [Re: LoneGunman]  
frenchelectrican  Offline
Member
Joined: Feb 2003
Posts: 939
Wi/ Paris France { France for ...
here the photo how this motour hook up

[img]https://www.electrical-photos.com/showphoto.php/photo/625[/img]

Hope that show ya how it run like that

Merci,Marc

Last edited by frenchelectrican; 03/31/10 01:47 AM.

Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)


#193408 - 03/31/10 06:17 AM Re: 3 phase 480v motor with 6 leads and no schematic [Re: frenchelectrican]  
Tesla  Offline
Member
Joined: Jun 2004
Posts: 1,273
Sacramento, CA
Marc...

The leads numbering smells of a Wye winding....

It is of LG to determine which is which.

BTW is this a NEMA motor?



Tesla

#193415 - 03/31/10 05:28 PM Re: 3 phase 480v motor with 6 leads and no schematic [Re: Tesla]  
LoneGunman  Offline
Member
Joined: Oct 2005
Posts: 141
Florida
I got it, I screwed up, it was NOT a dual voltage motor so 4,5,6 were together internally, 1-9 to l1, 2-8 to l2 and 3-7 to l3.


#193423 - 04/01/10 12:34 AM Re: 3 phase 480v motor with 6 leads and no schematic [Re: LoneGunman]  
frenchelectrican  Offline
Member
Joined: Feb 2003
Posts: 939
Wi/ Paris France { France for ...
I kinda figure it and it is a Wye connected motour.

I wish the motour manufacter just put in a quick note to stated that is delta or wye connected motour so we can able speed up the troubleshooting.

What I do with the motours I work on I take the stamping punch and punch either D or Y right next to the connection diagram or on pecker head one of the two.

Merci,Marc


Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)


#193432 - 04/01/10 02:40 PM Re: 3 phase 480v motor with 6 leads and no schematic [Re: LoneGunman]  
JRobb  Offline
New Member
Joined: Mar 2010
Posts: 1
Victoria BC
Hi, i might be confusing the issue here a little but if the 6 leads were disconnected it implies(UK) that the motor was fed via a star/delta (wye/Delta) starter,, if so if you wire it to run in wye you will have overheating problems and if in delta excessive starting load problems,,



#193438 - 04/01/10 06:24 PM Re: 3 phase 480v motor with 6 leads and no schematic [Re: JRobb]  
Tesla  Offline
Member
Joined: Jun 2004
Posts: 1,273
Sacramento, CA
LG, what was the driven load?

You may have to give it a soft-start intelligent controller.

Last edited by Tesla; 04/01/10 06:26 PM.

Tesla


Member Spotlight
The_Lightman
The_Lightman
Orlando, Fl, USA
Posts: 49
Joined: August 2001
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.015s Queries: 15 (0.002s) Memory: 0.8111 MB (Peak: 0.9908 MB) Zlib enabled. Server Time: 2017-08-23 02:37:41 UTC