ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
You will never guess
by grich - 02/24/21 07:18 PM
Lock-down Thread
by Bill Addiss - 02/24/21 04:40 PM
New tool
by SMOKEYBOB - 02/15/21 04:59 PM
Split Bus Breaker Panel
by gfretwell - 02/15/21 02:30 PM
Sierraplex recpts
by gfretwell - 02/15/21 02:27 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 32 guests, and 17 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
250.104(C) Bonding of isolated steel I-beam #185763 03/26/09 12:41 PM
Joined: Dec 2003
Posts: 751
E
earlydean Offline OP
Member
I would like to read about your past practices and experiences with inspectors as regards to bonding of isolated and exposed steel I beams in otherwise wood frame construction. There is no way this steel may become energized, as no electrical item is mounted on it, nor is any wiring method attached to or even resting on it. Is it required to be bonded or not?


Earl
2017 / 2014 NEC & Related Books and Study Guides
Re: 250.104(C) Bonding of isolated steel I-beam [Re: earlydean] #185776 03/26/09 05:59 PM
Joined: Mar 2003
Posts: 849
Y
Yoopersup Offline
Member
Can you give an Example say height , Location , ect.

Re: 250.104(C) Bonding of isolated steel I-beam [Re: Yoopersup] #185779 03/26/09 07:18 PM
Joined: Apr 2002
Posts: 7,233
HotLine1 Offline
Member
Earl:
Perhaps the steel is mechanically connected to the earth??

In that case....yes...bond


John
Re: 250.104(C) Bonding of isolated steel I-beam [Re: HotLine1] #185783 03/26/09 11:44 PM
Joined: Jul 2004
Posts: 9,569
G
gfretwell Online Content
Member
That is what I usually associate with the beam that goes across the basement. Typically it is an 8x17# on lally columns and caught at each end in a masonry pocket. (up there in the frozen north)
No. I have never seen any serious attempt to bond it.


Greg Fretwell
Re: 250.104(C) Bonding of isolated steel I-beam [Re: gfretwell] #185790 03/27/09 11:32 AM
Joined: Jul 2001
Posts: 599
J
JBD Offline
Member
The NEC says if it is 'likely' to become energized, not if it is just 'possible'.

Should houses along the Gulf coast be built with roofs capable of handling 12" snow loads? Should houses in the far northern Midwest be built to survive hurricanes? Both conditions are possible, however neither is likely. Should nails used to hang pictures be grounded? Aren't they likely to become energized? If they weren't, why the restrictions an how close NM cable can be run near the front of a wall cavity?



Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
AllClear
AllClear
Belmond Iowa US
Posts: 44
Joined: August 2005
Show All Member Profiles 
Top Posters(30 Days)
MCosta 3
Popular Topics(Views)
275,374 Are you busy
209,276 Re: Forum
196,570 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3