ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Vibrator Supplies??
by gfretwell - 10/19/19 08:33 PM
FPE in Germany
by NORCAL - 10/16/19 08:24 AM
Help with aging employee advice.
by Bill Addiss - 10/15/19 10:58 PM
Fuse blower plug?
by gfretwell - 10/13/19 03:23 PM
Power factor and transformer efficiency
by TeslaEdison - 10/13/19 04:05 AM
New in the Gallery:
FPE Breaker panel in germany
What is this for?
Who's Online Now
1 registered members (electure), 12 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
hospital iso panels? #183211 12/31/08 12:09 PM
Joined: Sep 2007
Posts: 14
A
allphase Offline OP
Member
happy new year all.

Got in to some thing the other day. looking for info.
are isolation panel still required in surgegy recovery rooms? and if so or not where in the code have thay been removed or that thay need to be there

any help would bee nice i have looked thru 517 and can not find any thing on it.

thanks larry

2017 / 2014 NEC & Related Books and Study Guides
Re: hospital iso panels? [Re: allphase] #183220 12/31/08 02:10 PM
Joined: Jan 2005
Posts: 5,316
renosteinke Offline
Cat Servant
Member
Such a requirement is a design decision, not a code one. Strictly speaking, the NEC doesn't mandate such things; it only allows other rules to be waived if such is present.

Medical facilities have all manner of 'special' needs these days. Not only is there the desire not to ignite anesthetic vapors, there are back-up power and ground fault protection decisions to be made. Then there's that whole 'equipotential plane' thing ....

In short, this is where the engineer or architect has to actually do some work, and not foist it all off on the trades to sort out.

Re: hospital iso panels? [Re: renosteinke] #183225 12/31/08 04:54 PM
Joined: May 2005
Posts: 984
G
ghost307 Offline
Member
We went around and around with this question for several hospital projects that I worked on.

The NEC only tells you HOW you need install this...not whether or not you need it.

Reviewing the rest of the 'tons' of Codes that apply to Health Care, the end result is that they aren't required by the letter of the law, although having them (IMHO) is an excellent idea.

Like with most things in this world...it always came down to the money. If it wasn't "required", the folks with the checkbooks saw no need to "waste good money" on them; no matter if they were recommended or not.


Ghost307
Re: hospital iso panels? [Re: ghost307] #183322 01/04/09 04:06 PM
Joined: Mar 2003
Posts: 849
Y
Yoopersup Offline
Member
There are Three Major areas in a Hospital.
Critical, General, Wet.
Critical General you can use GFI (lost of power can be tolerated),
Critical WET (Lost of power Cannot be tolerated(possibly cause a lose of life)Isolated power System required.
All areas to be desiginated by hospital Administerer (see definitations 517)
See 517.20 A Wet Locations.Receptacles & Fixed Equipment.
Yoopersup


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
AllClear
AllClear
Belmond Iowa US
Posts: 44
Joined: August 2005
Show All Member Profiles 
Top Posters(30 Days)
sparky 10
Popular Topics(Views)
259,660 Are you busy
195,033 Re: Forum
184,447 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3