ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Vibrator Supplies??
by gfretwell - 10/19/19 08:33 PM
FPE in Germany
by NORCAL - 10/16/19 08:24 AM
Help with aging employee advice.
by Bill Addiss - 10/15/19 10:58 PM
Fuse blower plug?
by gfretwell - 10/13/19 03:23 PM
Power factor and transformer efficiency
by TeslaEdison - 10/13/19 04:05 AM
New in the Gallery:
FPE Breaker panel in germany
What is this for?
Who's Online Now
0 registered members (), 31 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Gallery
Next Gallery
Print Thread
Rating: 5
Temporary Construction Power #181957 11/12/08 12:05 AM
TEMPOWER.JPG
Joined: Dec 2000
Posts: 4,281
electure Offline OP
Member
Temporary Construction Power

Would you use this? crazy It's secured to the pole with ductape.
Tools for Electricians:
6 Comments
Re: Temporary Construction Power [Re: electure] #181963 11/12/08 09:19 PM
Joined: May 2005
Posts: 247
T
techie Offline
Member
Lets see.. it needs covers, and the flying pigtails need to either be terminated, capped, or removed.

Is the box itself secured with duct tape, or was that left over from the missing cover?

Re: Temporary Construction Power [Re: techie] #181981 11/13/08 09:42 PM
Joined: Apr 2002
Posts: 7,121
HotLine1 Online Content
Member
Where is this from?


John
Re: Temporary Construction Power [Re: HotLine1] #181986 11/14/08 12:29 PM
Joined: Dec 2000
Posts: 4,281
electure Offline OP
Member
The picture was taken at a (big) new auto dealership in the City of Industry, CA; the job lasted about a year. There were 20 or so of these temps placed around the project; the other ones were in good shape.

The only other strap was at the top of the riser. The screws supporting the temp were missing from the panel, and the strap was missing from the riser nearest the panel. It left the panel free to swing to and fro. It slid down the pole about a foot. Someone put a piece of Ductape on it to secure it to the pole.

Re: Temporary Construction Power [Re: electure] #181998 11/14/08 11:37 PM
Joined: Apr 2002
Posts: 7,121
HotLine1 Online Content
Member
Thanks for the response. Guess that after a year of faithful duty....time for retirement! That's not a common setup (panel/recepts) here in NJ.


John
Re: Temporary Construction Power [Re: electure] #182057 11/17/08 01:14 AM
Joined: Oct 2000
Posts: 3,587
Admin Offline
Administrator
Member
I've got a matching Light Fixture somewhere ...

LOL
smile
Bill

Re: Temporary Construction Power [Re: Admin] #182096 11/18/08 12:02 AM
Joined: Aug 2007
Posts: 61
TOOL_5150 Offline
Member
I like the ground just hanging out.

~Matt


I would rather beg for forgiveness then beg for permission.

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Posts: 362
Joined: April 2003
Show All Member Profiles 
Top Posters(30 Days)
sparky 10
Popular Topics(Views)
259,745 Are you busy
195,070 Re: Forum
184,480 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3