ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Light activation in closet by a broken connection?
by geoff in UK. 02/19/19 01:35 PM
AFDD's coming to the UK
by Texas_Ranger. 02/18/19 02:04 PM
Israel
by Texas_Ranger. 02/18/19 02:01 PM
250.104
by gfretwell. 02/16/19 01:08 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 1 guest and 15 spiders.
Key: Admin, Global Mod, Mod
Previous Gallery
Next Gallery
Print Thread
Rating: 5
Temporary Construction Power #181957
11/11/08 11:05 PM
11/11/08 11:05 PM
TEMPOWER.JPG
Joined: Dec 2000
Posts: 4,279
Fullerton, CA USA

electure Offline OP

Member
Temporary Construction Power

Would you use this? crazy It's secured to the pole with ductape.
6 Comments
Re: Temporary Construction Power [Re: electure] #181963
11/12/08 08:19 PM
11/12/08 08:19 PM
T
techie  Offline
Member
Joined: May 2005
Posts: 247
palo alto, ca usa
Lets see.. it needs covers, and the flying pigtails need to either be terminated, capped, or removed.

Is the box itself secured with duct tape, or was that left over from the missing cover?

Super Rod Cable Installation Tools

Super Rod Cable Rod System
Super Rod Cable Rod System -
Voted
Best Product of the Last 50 Years by members of NICEIC

Re: Temporary Construction Power [Re: techie] #181981
11/13/08 08:42 PM
11/13/08 08:42 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,069
Brick, NJ USA
Where is this from?


John
Re: Temporary Construction Power [Re: HotLine1] #181986
11/14/08 11:29 AM
11/14/08 11:29 AM
electure  Offline
OP
Member
Joined: Dec 2000
Posts: 4,279
Fullerton, CA USA
The picture was taken at a (big) new auto dealership in the City of Industry, CA; the job lasted about a year. There were 20 or so of these temps placed around the project; the other ones were in good shape.

The only other strap was at the top of the riser. The screws supporting the temp were missing from the panel, and the strap was missing from the riser nearest the panel. It left the panel free to swing to and fro. It slid down the pole about a foot. Someone put a piece of Ductape on it to secure it to the pole.

Re: Temporary Construction Power [Re: electure] #181998
11/14/08 10:37 PM
11/14/08 10:37 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,069
Brick, NJ USA
Thanks for the response. Guess that after a year of faithful duty....time for retirement! That's not a common setup (panel/recepts) here in NJ.


John
Re: Temporary Construction Power [Re: electure] #182057
11/17/08 12:14 AM
11/17/08 12:14 AM
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,536
NY, USA
I've got a matching Light Fixture somewhere ...

LOL
smile
Bill

Re: Temporary Construction Power [Re: Admin] #182096
11/17/08 11:02 PM
11/17/08 11:02 PM
TOOL_5150  Offline
Member
Joined: Aug 2007
Posts: 61
Bay Area
I like the ground just hanging out.

~Matt


I would rather beg for forgiveness then beg for permission.

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Joe Tedesco
Joe Tedesco
Boston, Massachusetts USA
Posts: 2,749
Joined: October 2000
Show All Member Profiles 
Top Posters(30 Days)
Admin 9
Trumpy 3
Popular Topics(Views)
253,294 Are you busy
189,908 Re: Forum
179,629 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.030s Queries: 18 (0.006s) Memory: 0.9892 MB (Peak: 1.1628 MB) Zlib enabled. Server Time: 2019-02-22 08:55:57 UTC