ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 519 guests, and 18 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Mar 2004
Posts: 947
T
twh Offline
Member
Originally Posted by mikesh
No you don't have to add an overload. Sorry code book is not handy but section 28 does mention thermally protected motors.

Yes, in regards to overheating, which is not required on motors that don't need overload protection. (28-314 / 28-318 / 28-302) Am I missing something?

Joined: Dec 2007
Posts: 35
H
Member
thermistors are part of the windings they are meant only to shut down the motor so that it doesnt overheat and burn

Joined: Apr 2003
Posts: 13
T
Junior Member
Originally Posted by twh
I think the confusion is about a $50 motor protected by $150 of overload devices.


Unless the Electrical Engineer on the jobs askes for it and, of course, you haven't put that into your estimate! Heck he'll probably ask for a NEMA 4 enclosure, hand/off/auto, push button off/on, and a min. of 1 1/4" EMT conduit feeding it! (crazy yes, you never know with EE)

Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5