ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
What does your work place look like?
by Lostazhell - 11/25/20 02:56 AM
Happy Thanksgiving
by gfretwell - 11/24/20 05:44 PM
Where is Everyone?
by Lostazhell - 11/21/20 04:17 AM
Ground fault remover :-)
by dsk - 11/21/20 02:47 AM
Work Gloves?
by gfretwell - 11/20/20 10:17 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
1 registered members (Lostazhell), 17 guests, and 16 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
'Temporary' Transformer Hookup #175817 03/11/08 09:30 PM
Joined: Oct 2000
Posts: 3,632
Admin Offline OP
Administrator
Member
Quote
Hows this for temporary?

This Trani blew a few yrs back. Now they won't give us a shut down to replace it.

- Leland

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

Tools for Electricians:
Re: 'Temporary' Transformer Hookup [Re: Admin] #175897 03/14/08 02:53 AM
Joined: Jul 2002
Posts: 8,346
Trumpy Offline
Member
OK then,
Now, who is responsible for this mess?
You have an open panel with terminals exposed.

So, "they" won't let you shut this down?
What does this transformer supply?
Even more to the point, who are "they"?
There is absolutely no reason why something like this cannot be shut down, anyone who says to the contrary, is dreaming.

Just my opinion.

Re: 'Temporary' Transformer Hookup [Re: Admin] #175910 03/14/08 01:00 PM
Joined: Jul 2004
Posts: 783
L
LarryC Offline
Member
Is that a breaker panel that reaches all the way down to the floor? It looks like the bottom breakers are only 12" from the floor.

Larry C

Re: 'Temporary' Transformer Hookup [Re: LarryC] #175939 03/15/08 11:35 AM
Joined: Jul 2007
Posts: 1,335
S
sparkyinak Offline
Member
Customers are willing to pay a high price to be cheap. Years ago, a couple of co-workers went to investigate a transformer at a foundry. It was a oil filled can like the POCO's use on poles. The lid blew off and half the oil boiled off and the customer wanted to know if they can keep running it that way. I do not believe they were running 24/7 operations at the time. They just did not want give up the money. Even when money is tight, you think it was a no brainer.


"Live Awesome!" - Kevin Carosa
Re: 'Temporary' Transformer Hookup [Re: LarryC] #175940 03/15/08 11:36 AM
Joined: Aug 2007
Posts: 853
L
leland Offline
Member
Mike, A world renouned college, Known for its Engineering wonders of the world. (Big dome )

This is a distribution panel for 120/240 lab panels a and class rooms. RE; shut down, your right.
The bottom line is they don't want to pay OT!!.

Larry, we have the 12" at the bottom.

This is a 225 KVA 480-240. My surprise, 2002!!!! 6 YEARS!!!
I guess their priority is the students.

Re: 'Temporary' Transformer Hookup [Re: leland] #175941 03/15/08 11:38 AM
Joined: Jul 2007
Posts: 1,335
S
sparkyinak Offline
Member
I work for the government. 6 years is still considered temporary. smile


"Live Awesome!" - Kevin Carosa
Re: 'Temporary' Transformer Hookup [Re: sparkyinak] #175942 03/15/08 11:56 AM
Joined: Aug 2007
Posts: 853
L
leland Offline
Member
Originally Posted by sparkyinak
I work for the government. 6 years is still considered temporary. smile


You aint kidding!! Temporarily permanent!

Re: 'Temporary' Transformer Hookup [Re: leland] #175981 03/17/08 03:18 AM
Joined: Dec 2001
Posts: 2,486
T
Texas_Ranger Offline
Member
In Austria they say temporary solutions usually last longer than permanent ones... in 1892 the city built a temporary subway station (temporary becaus it was close to a bridge scheduled for a major redesign and they planned to build the permanent station after the bridge work was completed). The temporary station lasted until about 1960... the permanent station built afterwards was demolished again in 1978. So that makes 68 years for the temp solution and 28 for the permanent... nice, huh?

Re: 'Temporary' Transformer Hookup [Re: leland] #176082 03/19/08 08:58 PM
Joined: Aug 2005
Posts: 214
E
Elviscat Offline
Member
Considering the U I think this is, it makes it all the more funny, not exactly an engineering or technological masterpiece.

-Will

Re: 'Temporary' Transformer Hookup [Re: leland] #176095 03/20/08 10:58 AM
Joined: Mar 2005
Posts: 1,213
S
SteveFehr Offline
Member
Originally Posted by leland
Mike, A world renouned college, Known for its Engineering wonders of the world. (Big dome )

This is a distribution panel for 120/240 lab panels a and class rooms. RE; shut down, your right.
The bottom line is they don't want to pay OT!!.

Larry, we have the 12" at the bottom.

This is a 225 KVA 480-240. My surprise, 2002!!!! 6 YEARS!!!
I guess their priority is the students.
I've see the same situation more times than I care to count... our problem isn't cost though (well, not always) but unwillingness to schedule downtime. Hey, power's still flowing so it might be OK, right??

Page 1 of 2 1 2

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
watersparkfalls
watersparkfalls
Washington...Not DC
Posts: 236
Joined: March 2005
Show All Member Profiles 
Top Posters(30 Days)
Trumpy 9
Popular Topics(Views)
271,932 Are you busy
205,808 Re: Forum
193,892 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3