ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Lock-down Thread
by Bill Addiss - 02/27/21 01:16 PM
Northern Tool Recalls Powerhorse Generators
by Admin - 02/25/21 09:49 PM
You will never guess
by gfretwell - 02/25/21 07:48 PM
New tool
by SMOKEYBOB - 02/15/21 04:59 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 20 guests, and 18 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Multi-Family Service Upgrade #171577 11/30/07 11:59 PM
Joined: Oct 2000
Posts: 3,636
Admin Offline OP
Administrator
Member
Quote
Attached are several code violations all for the same job. I was called out to “finish” the little bit of stuff that was left by the other contractor. When I told the property manager that we would have to redo pretty much the entire installation he sounded surprised.

The pictures should speak for themselves, there are so many code violations in each of them it is hard to encapsulate in the captioning. All of the new looking items were installed by the other electrician. I was trying to get a name from them so I could turn them in to the Contractors Board.

Roger Ervine

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

[Linked Image from electrical-photos.com]

2017 / 2014 NEC & Related Books and Study Guides
Re: Multi-Family Service Upgrade [Re: Admin] #171590 12/01/07 11:56 AM
Joined: Jan 2005
Posts: 5,316
renosteinke Offline
Cat Servant
Member
Looks like a 'work in progress' ... one that was stopped before serious harm was done!

FWIW, here the PoCo would not let us use PVC pipe for an overhead feed.

I am puzzled by the extended time that the job is taking ... as suggested by the pictures. A job like this has but one way to do it - and that is, to kill all the power for the two or three days needed, and GET IT DONE. I've done such in sub-zero weather ... using a 'spider box' to keep the heat on and the fridge running.

Re: Multi-Family Service Upgrade [Re: Admin] #171596 12/01/07 01:38 PM
Joined: Mar 2004
Posts: 391
B
BigJohn Offline
Member
In picture 6 that shows the PVC pipe running along the side of the house, what's the violation there? Is it that they went to the trouble to install their new entrance conductors over-top the old ones that should be getting demo'd? Or that they put their strut at an elbow?

And I haven't worked on many residential services, so I don't understand the violation in picture 7 either. I don't even understand the label: A 125A meter socket rated for 400 amps...? Is that 400 total and 125 per meter or something?

The rest of that, however, is obviously pretty nasty. It always rings alarm bells for me when I hear stories about electricians being called to "just finish a little bit" of someone else's work. There's usually a good reason that "someone else" isn't there anymore. Either they were fired for hack work or skipped out to avoid prosecution for hack work.

-John

Re: Multi-Family Service Upgrade [Re: BigJohn] #171672 12/02/07 11:51 PM
Joined: Jan 2007
Posts: 6
F
Fidelity Electric Offline
Junior Member
Originally Posted by BigJohn
In picture 6 that shows the PVC pipe running along the side of the house, what's the violation there? Is it that they went to the trouble to install their new entrance conductors over-top the old ones that should be getting demo'd? Or that they put their strut at an elbow?

And I haven't worked on many residential services, so I don't understand the violation in picture 7 either. I don't even understand the label: A 125A meter socket rated for 400 amps...? Is that 400 total and 125 per meter or something?

The rest of that, however, is obviously pretty nasty. It always rings alarm bells for me when I hear stories about electricians being called to "just finish a little bit" of someone else's work. There's usually a good reason that "someone else" isn't there anymore. Either they were fired for hack work or skipped out to avoid prosecution for hack work.

-John


Picture 6 shows a 2" conduit running to the 4 meter stack. The nameplate picture is for the four meter main buss (400A). By my calculations Table 310.15(B)(6) 400A copper is 400kcmil wire or a minimum 3 conductor feeder conduit size of 3" for the conduit(they used 2"). The conduit is coming from the junction box on the corner that is a nema 3R can mounted upside down. I am pretty sure without even checking that the can dimension is WAY undersized for that size wire, I would guess somewhere around a 24X24X6 without doing the calculation. One of the other pictures shows exposed PVC conduit running through the utilities gas piping which is a big no-no. As far as the PVC being legal overhead I don't think that is even allowed. I personally would have installed EMT or rigid for the installation.

Last edited by Fidelity Electric; 12/02/07 11:56 PM.

You can learn a lot from a dummy...buckle up!!
Re: Multi-Family Service Upgrade [Re: Admin] #171673 12/03/07 12:38 AM
Joined: Feb 2004
Posts: 1,437
Lostazhell Offline
Member
This place reminds me so much of A Few Things That Blew My Fuse , it's not even funny.... Ironically also from when I was working in San Diego. (Old Town) Even worse, this looks like some shotgun little cottages that I remember taking a look at someplace around University/Euclid Ave. area... I walked away from that one, then drove away alot faster!

Randy

Re: Multi-Family Service Upgrade [Re: Lostazhell] #171678 12/03/07 05:29 AM
Joined: Jul 2002
Posts: 680
W
walrus Offline
Member
They taped the wire nuts, what else can you ask for smile

Was some of that temporary?? while they completed the job??

Re: Multi-Family Service Upgrade [Re: walrus] #171698 12/03/07 02:50 PM
Joined: Jul 2007
Posts: 85
W
WireNuts29 Offline
Member
I want to see an over all pic of the entire wall. This is quite a bit of hackermanship. It's a shame cause thats not a cheap meterstack. apparently they forgot to pick up the how to change a service 1-2-3 book at home depot.

Re: Multi-Family Service Upgrade [Re: Admin] #171717 12/04/07 01:53 AM
Joined: Jun 2007
Posts: 50
H
hardwareguy Offline
Member
Wow....just wow! That's about all I can say for this fine example of how not to do it.

Did they actually expect this to pass?

Re: Multi-Family Service Upgrade [Re: Admin] #171745 12/04/07 05:03 PM
Joined: Aug 2005
Posts: 214
E
Elviscat Offline
Member
I have a problem with the opside-down 3R can, and BIG problems with the way they made up the temp

What I do not have a problem with is the size of the pipe in relation to the meter pack, the proper way to do this would be to perform a load calc on the building, and feed the meter pack based on that. It looks like they're missing a clamp on that PVC right near the 90 because the conduit both has to be on top of that gas line, and to get the proper depth for the meter pack, I would have used deep channel strut to avoid both of these issues.

my $0.02
-Will

Re: Multi-Family Service Upgrade [Re: Elviscat] #171752 12/04/07 08:29 PM
Joined: Jul 2007
Posts: 265
W
wire_twister Offline
Member
A 400 amp meter set needs a feeder capable of 400 amps. We can not control what someone might do in the future, therefore if it says 400 on the plate it should be able to carry it.


Jimmy

Life is tough, Life is tougher when you are stupid
Page 1 of 2 1 2

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Scott35
Scott35
Anaheim, CA. USA
Posts: 2,721
Joined: October 2000