ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Does a 'normal 3ph-AC motor' include capacitors?
by pcsailor - 09/16/19 05:45 AM
NEC Question_Cord-&-Plug EGC shorter then Neutral
by pcsailor - 09/16/19 05:26 AM
Another NEC 2017 Question_240/24VAC Txfr-Neutral R
by pcsailor - 09/16/19 05:22 AM
NEC 2017_392.22(B)(1)(b)
_What's the smallest width

by pcsailor - 09/15/19 07:58 PM
Service Question
by HotLine1 - 09/14/19 01:43 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
1 registered members (Scott35), 9 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Lift Station Kaboom #165437 06/27/07 07:43 PM
Joined: Dec 2000
Posts: 4,281
electure Offline OP
Member
From Lone Gunman

Quote
This is by far the worst fire/kaboom I've seen in person and had to repair.

The meter still hanging on the rack is a 480v service for a parking lot lighting at a Lowes. We are not contracted to repair this.

The meter pictured on the ground was to the right of the Lowes meter and is a 120/208v three phase service for a county lift station. It fed a 100a three phase disconnect located 10' to the left of the rack.

Poco claims the cause was a lightning strike. The #4 solid ground wire was intact and connected to a 5/8" ground rod.

Both services are fed from different transformers with both being 200' away or so.

The picture of the disconnect panel covers shows them bowed out from the blast and you can see the disconnect also bowed out, no fire damage though.

The picture of the 4 #1's show they are all fused together, this was down in a RMC 90 which they used to go from PVC to RMC.

The picture of the closed PoCo hand hole shows where the PVC STOPPED, The wire was not protected from the end of the conduit shown to inside the hand hole.

I'd like opinions of whether you guys think lightning did this, I'm thinking it was a phase to phase short



[Linked Image]


[Linked Image]


[Linked Image]


[Linked Image]


[Linked Image]


[Linked Image]

Tools for Electricians:
Re: Lift Station Kaboom [Re: electure] #165439 06/27/07 07:44 PM
Joined: Dec 2000
Posts: 4,281
electure Offline OP
Member
Here are a few more pics:


[Linked Image]


[Linked Image]


[Linked Image]

Re: Lift Station Kaboom [Re: electure] #165473 06/28/07 12:58 PM
Joined: Jun 2005
Posts: 821
S
ShockMe77 Offline
Member
Perhaps the wrong available interupt current rating on the main disconnect.

I've seen some fried things before and that ranks right up there with the best of them.

Re: Lift Station Kaboom [Re: ShockMe77] #165484 06/28/07 06:21 PM
Joined: Apr 2002
Posts: 7,109
HotLine1 Offline
Member
IMHO, the lightning theory may be right. Had two similar at two different Golf courses, 120/208 for well pumps. 100' to the pots (OH to UG).

John


John

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HappyElectrician
HappyElectrician
Penn USA
Posts: 31
Joined: December 2011
Show All Member Profiles 
Top Posters(30 Days)
Admin 11
Popular Topics(Views)
258,578 Are you busy
194,173 Re: Forum
183,648 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3