ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Inspection camera help
by petey_c. 09/22/18 07:52 AM
Motion detectors and dimmers
by gfretwell. 09/20/18 04:02 PM
Extension cords
by annemarie1. 09/20/18 08:54 AM
220/230/240V 60Hz Systems
by gfretwell. 09/16/18 12:37 PM
Acronis Backup 2017
by gfretwell. 09/16/18 12:46 AM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 21 guests, and 22 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Demand Meter #161585
04/04/07 06:25 PM
04/04/07 06:25 PM
C
cgw  Offline OP
Member
Joined: Jul 2004
Posts: 133
Rochester NY
Can any one suggest an instrument I can use connected to a service (say for 1 month) to determine the electrical demand? This is specifically to comply with NEC 220.87(1)Exception. I was thinking of an E-mon Series 2000 but I think I would need more than one if I wanted to use it for both 240-1 and 208-3.

Work Gear for Electricians and the Trades
Re: Demand Meter [Re: cgw] #161611
04/05/07 07:22 AM
04/05/07 07:22 AM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,024
Brick, NJ USA
The E-mon requires a voltage reference, as do all meters that I am aware of.

There are KW/KWHr recorders available (buy or rent) that will do what is needed for 220-87 Exc.

This info is available here (NJ) from the utility companies. That info is acceptable for NEC compliance, and should be easy to obtain, IF the job you are involved in has utility power.

GE rental is a source for rental test equip; as are many others if you Google.

WW Grainger has recording test equip available if you want to go that route.

John


John
Re: Demand Meter [Re: HotLine1] #161904
04/09/07 12:31 PM
04/09/07 12:31 PM
C
cgw  Offline OP
Member
Joined: Jul 2004
Posts: 133
Rochester NY
9 out of 10 times I can just get the demand from the utility. Once in a while we need to add power to a sub-panelboard or transformer in a larger building or to a building without a demand meter (e.g. around here church buildings do not have demand meters).


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HCE727
HCE727
Delaware County, PA, USA
Posts: 186
Joined: November 2005
Show All Member Profiles 
Top Posters(30 Days)
Admin 13
Trumpy 11
Popular Topics(Views)
249,381 Are you busy
187,312 Re: Forum
176,656 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.015s Queries: 15 (0.004s) Memory: 0.9511 MB (Peak: 1.0759 MB) Zlib enabled. Server Time: 2018-09-23 00:35:49 UTC