ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
Generator Cable Sizing
by HotLine1. 10/16/17 07:13 PM
Another generator question
by HotLine1. 10/16/17 07:02 PM
Thermal Imaging Camera upgrade
by SteveFehr. 10/15/17 08:15 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,335 Are you busy
177,278 Re: Forum
168,917 Need opinion
Who's Online Now
0 registered members (), 17 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#161585 - 04/04/07 06:25 PM Demand Meter  
cgw  Offline
Member
Joined: Jul 2004
Posts: 133
Rochester NY
Can any one suggest an instrument I can use connected to a service (say for 1 month) to determine the electrical demand? This is specifically to comply with NEC 220.87(1)Exception. I was thinking of an E-mon Series 2000 but I think I would need more than one if I wanted to use it for both 240-1 and 208-3.


Work Gear for Electricians and the Trades

#161611 - 04/05/07 07:22 AM Re: Demand Meter [Re: cgw]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,872
Brick, NJ USA
The E-mon requires a voltage reference, as do all meters that I am aware of.

There are KW/KWHr recorders available (buy or rent) that will do what is needed for 220-87 Exc.

This info is available here (NJ) from the utility companies. That info is acceptable for NEC compliance, and should be easy to obtain, IF the job you are involved in has utility power.

GE rental is a source for rental test equip; as are many others if you Google.

WW Grainger has recording test equip available if you want to go that route.

John


John

#161904 - 04/09/07 12:31 PM Re: Demand Meter [Re: HotLine1]  
cgw  Offline
Member
Joined: Jul 2004
Posts: 133
Rochester NY
9 out of 10 times I can just get the demand from the utility. Once in a while we need to add power to a sub-panelboard or transformer in a larger building or to a building without a demand meter (e.g. around here church buildings do not have demand meters).



Member Spotlight
Theelectrikid
Theelectrikid
Levittown, PA
Posts: 810
Joined: April 2004
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.013s Queries: 15 (0.003s) Memory: 0.7523 MB (Peak: 0.8781 MB) Zlib enabled. Server Time: 2017-10-17 09:31:46 UTC