ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
250.104
by gfretwell. 02/16/19 01:08 PM
PurpleAir Recalls Power Supply Units
by Admin. 02/14/19 08:43 PM
Utility Company Programs
by katty81. 02/14/19 11:11 AM
AFDD's coming to the UK
by Trumpy. 02/14/19 12:29 AM
Delta Electronics Recalls Solar Inverters
by electech. 02/13/19 10:26 AM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 6 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Demand Meter #161585
04/04/07 05:25 PM
04/04/07 05:25 PM
C
cgw  Offline OP
Member
Joined: Jul 2004
Posts: 134
Rochester NY
Can any one suggest an instrument I can use connected to a service (say for 1 month) to determine the electrical demand? This is specifically to comply with NEC 220.87(1)Exception. I was thinking of an E-mon Series 2000 but I think I would need more than one if I wanted to use it for both 240-1 and 208-3.

Work Gear for Electricians and the Trades
Re: Demand Meter [Re: cgw] #161611
04/05/07 06:22 AM
04/05/07 06:22 AM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 7,069
Brick, NJ USA
The E-mon requires a voltage reference, as do all meters that I am aware of.

There are KW/KWHr recorders available (buy or rent) that will do what is needed for 220-87 Exc.

This info is available here (NJ) from the utility companies. That info is acceptable for NEC compliance, and should be easy to obtain, IF the job you are involved in has utility power.

GE rental is a source for rental test equip; as are many others if you Google.

WW Grainger has recording test equip available if you want to go that route.

John


John
Re: Demand Meter [Re: HotLine1] #161904
04/09/07 11:31 AM
04/09/07 11:31 AM
C
cgw  Offline OP
Member
Joined: Jul 2004
Posts: 134
Rochester NY
9 out of 10 times I can just get the demand from the utility. Once in a while we need to add power to a sub-panelboard or transformer in a larger building or to a building without a demand meter (e.g. around here church buildings do not have demand meters).


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Samurai
Samurai
Fl.
Posts: 46
Joined: May 2007
Show All Member Profiles 
Top Posters(30 Days)
Admin 7
andey 3
Popular Topics(Views)
253,217 Are you busy
189,873 Re: Forum
179,572 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.022s Queries: 15 (0.004s) Memory: 0.9506 MB (Peak: 1.0749 MB) Zlib enabled. Server Time: 2019-02-17 09:51:40 UTC